[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2019, Vol. 56 Issue (5) :170-179    DOI:
施工技术 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
采用三台阶工法开挖的原位扩建隧道现场监测及分析
(福建厦蓉高速公路漳龙段扩建工程有限公司,龙岩 364000)
Field Monitoring and Analysis of In-situ Tunnel Extension by Three-bench Method
(Zhanglong Extension Section of Fujian Xiarong Expressway Co., Ltd., Longyan 364000)
Download: PDF (4909KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为研究三台阶法施工对原位扩建隧道结构及邻近既有隧道扰动的影响规律,文章依托福建厦蓉高速公路后祠隧道原位扩建工程,分别对隧道围岩及支护结构应力、松动圈及应力场和邻近既有隧道爆破振动进行了现场监测。结果表明,断面各部位围岩及支护结构应力随时间推移而缓慢增加,最终趋于平稳,且每级台阶开挖均会对其产生扰动,表现为应力的突增;扩建后隧道围岩松动圈拱顶位于6~ 9 m深处,左右边墙均位于0~6 m深处,拱顶沉降位移大于两帮收敛位移。左边墙围岩应力大于右边墙围岩应力,洞周3 m深处围岩应力小于6 m深处围岩应力,开挖造成的围岩塑性区为3 m左右;施工中实际爆破振速大多小于设防标准,爆破对既有隧道的支护结构体系未造成重大破坏,最大爆破振速出现在监测断面前10 m左右的位置,与掌子面相比振速增长2.9%~4.5%,且围岩质量越好,峰值振速越大,最大峰值振速断面前方振速衰减速度远远小于后方振速衰减速度。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
钟元庆
关键词:   
Abstract: In order to study the effect law of three-bench construction method on extended tunnel structure and ad? jacent existing tunnel, site monitoring of stress of surrounding rocks and support structure, loosening circle and stress field as well as blast vibration of existing tunnel was conducted based on the extension project of the Houci tunnel on Xiamen-Chengdu expressway in Fujian province. The results show that stress of the rock mass and support structure increases gradually with the time and tends to be stable at last, each bench excavation will cause disturbance and it is represented as sudden increase of stress; after tunnel extension the loosening circle of surrounding rocks at the vault is 6-9 m deep, the loosening circle at the left and right sidewall is 0-6m deep, and the crown settlement is larger than the convergence at the two shoulders, the stress of surrounding rocks of the left sidewall is larger than that of the right sidewall, the stress of surrounding rocks at the depth of 3 m around tunnel is smaller than that at the depth of 6 m, and the excavation induced plastic zone is around 3 m; the actual blast vibration velocity is mostly smaller than the one specified by the designed standard, blasting didn′t cause serious damage to the support structure system of existing tunnel, the max. blast vibration velocity occurs at the place 10 m ahead of the monitoring section and it increases by 2.9%-4.5% compared with that at working face, the better the quality of rock mass, the larger the peak vibration velocity, the attenuation rate of vibration velocity in front of the section with the max. peak vibration velocity is far less smaller than that at the rear.
KeywordsIn-situ tunnel extension,   Three-bench method,   Loosening circle,   Blast vibration     
作者简介: 作者简介:钟元庆 ( 1972-),男,高级工程师,主要从事高速公路建设管理工作,E-mail:zyq9305628@163. com.
引用本文:   
钟元庆 .采用三台阶工法开挖的原位扩建隧道现场监测及分析[J]  现代隧道技术, 2019,V56(5): 170-179
ZHONG Yuanqing .Field Monitoring and Analysis of In-situ Tunnel Extension by Three-bench Method[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(5): 170-179
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2019/V56/I5/170
 
没有本文参考文献
[1] 范 磊.高地温深埋特长隧道热害综合防治关键技术研究[J]. 现代隧道技术, 2019,56(6): 1-10
[2] 高菊茹 1 张 博 1 王 耀 1 渠浩波 1 姚志军 2.高海拔特长公路隧道施工作业环境改善关键技术研究[J]. 现代隧道技术, 2019,56(6): 11-18
[3] 柳 献 1 李海涛 1 管攀峰 2 杨志豪 2.快速接头盾构隧道衬砌结构设计参数研究[J]. 现代隧道技术, 2019,56(6): 19-26
[4] 李 强 1 甘鹏路 2,3 钟小春 4.盾构隧道管片壁后注浆厚度对隧道抗浮影响研究[J]. 现代隧道技术, 2019,56(6): 27-35
[5] 李荣欣 1 陈骅伟 2 周松元 1 刘新平 1.含油气隧道瓦斯成因分析与安全治理[J]. 现代隧道技术, 2019,56(6): 36-40
[6] 唐 斌.成都地铁龙泉山隧道浅层天然气分布特征及运移规律研究[J]. 现代隧道技术, 2019,56(6): 41-46
[7] 秦 良 1 张庆朝 2.瞬变电磁法隧道超前地质预报物理模拟[J]. 现代隧道技术, 2019,56(6): 47-51
[8] 张民庆 黎 庶 刘俊成.横向内置加劲型中埋式橡胶止水带研制[J]. 现代隧道技术, 2019,56(6): 52-56
[9] 麻世垄 吴明颖 姚兆明.人工冻土蠕变试验及损伤经验模型分析[J]. 现代隧道技术, 2019,56(6): 57-62
[10] 马 莉 1 李 盛 2 王起才 2 于本田 2 刘亚朋 2 王庆石 2.高填黄土矩形、拱形明洞减载结构土压力差异性规律研究[J]. 现代隧道技术, 2019,56(6): 63-69
[11] 郭 健 1,2 杨治国 1,2 康逢学 3.基于向量投影响应面法的隧道围岩变形稳定可靠度分析[J]. 现代隧道技术, 2019,56(6): 70-77
[12] 刘明才.隧道超欠挖下锚喷支护系统的稳定性分析[J]. 现代隧道技术, 2019,56(6): 78-84
[13] 于建新 1 刘焕春 2 魏海霞 1 陈 晨 1.近邻隧道爆破施工相互动力影响研究[J]. 现代隧道技术, 2019,56(6): 85-92
[14] 谢立广 1 杨 群 2 盛 湧 1 唐富军 1.关于公路隧道健康状况均衡评估模型的探索[J]. 现代隧道技术, 2019,56(6): 93-98
[15] 孙浩轩 1 李培现 1 崔希民 1 姚德华 2 肖 武 3.巴岳山隧道受煤矿采动影响分析[J]. 现代隧道技术, 2019,56(6): 99-106
Copyright 2010 by 现代隧道技术