[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2020, Vol. 57 Issue (2) :86-95    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
灰土挤密桩加固黄土隧道受力与变形性状分析
(1中交第一公路勘察设计研究院有限公司,西安 710075,;2长安大学公路学院,西安 710064;3林同棪(重庆)国际工程技术有限公司,重庆 401121)
Analysis of Mechanical Behaviors and Deformation Characteristics of the Loess Tunnel Reinforced by Lime-soil Compaction Piles
(1 CCCC First Highway Consultants Co. Ltd., Xi′an 710075;2 School of Highway, Chang′an University, Xi′an 710064;3 T.Y.Lin ( Chongqing) International Engineering Technology Co., Ltd., Chongqing 401121)
Download: PDF (4848KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 兰州地区黄土土质疏松、孔隙比大、强度低,普遍具有严重的湿陷性、高压缩性和动力易损性,在增加正压力或孔隙水压力时,极易引起隧道底部及建筑物地基的破坏。为解决兰州绕城高速某大断面黄土隧道底部变形过大的问题,文章选择灰土挤密桩作为加固手段,采用三维数值方法对隧底未处理条件下和采用灰土挤密桩加固后的围岩变形与受力特征进行研究。结果表明:隧底开挖后主要产生隆起,并随开挖方向逐渐增大,起点拱脚处产生下沉,位移最大值出现在隧底中心处;采用灰土挤密桩加固后,其桩身轴力、桩身应力和桩身位移在水平方向均呈现出两边小、中间大的规律,且随开挖方向逐渐增大,桩身承担了隧道开挖产生的大部分荷载,隧底受力与变形均有所减小;灰土挤密桩加固后的隧底位移值减小了32.0% ~ 34.4%,灰土挤密桩能够很好地提高黄土隧道隧底承载力和抵抗变形的能力。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
单 超 1
2 甘 露 2
3 王亚东 2 曹校勇 1
2 赖金星 2
关键词:   
Abstract: The loess in Lanzhou is characterized by severe collapsibility, high compressibility and dynamic vulner? ability due to its loose texture, large void ratio and low strength, and it′ s easy to cause failures at tunnel floor and building foundation whenever the positive pressure or pore water pressure increase. Aiming at the deformation of a large-section loess tunnel in Lanzhou, reinforcement is conducted by the lime-soil compaction pile, and a three-dimensional numerical method is adopted to study the characteristics of deformations and mechanical behaviors before and after reinforcement with lime-soil compaction piles. The results show that before reinforcement with limesoil piles the heaving occurs and gradually increases along with the direction of excavation, subsidence occurs at arch spring, the maximum displacement occurs at the center of tunnel bottom; after reinforcement with lime-soil piles, the pile axial force, pile stress and pile displacement are small on both sides and large in the middle in horizontal direction, and they increase gradually along with the excavation direction, the piles bear most of the load produced by tunnel excavation, and the force and deformation at tunnel bottom decrease, and the displacement at tun? nel floor is reduced by 32%-34.4%, which shows the lime-soil compaction pile can improve the bearing capacity and resistance to deformation at tunnel bottom of the loess tunnel.
KeywordsLanzhou,   loess tunnel,   Lime-soil compaction pile,   Force and deformation,   Numerical simulation     
基金资助:基金项目:中央高校基本科研业务费专项基金(310821172004,310821153312,310821165011);西部交通建设科技项目(2014 318 J27 210)
作者简介: 作者简介:单 超(1987-),男,工程师,主要从事岩土与隧道工程的科研与设计工作,E-mail:532438389@ qq. com. 通讯作者:赖金星(1973-),男,教授,博士生导师,主要从事隧道与地下工程方面的科研与教学工作,E-mail:373159626@qq.com.
引用本文:   
单 超 1, 2 甘 露 2, 3 王亚东 2 曹校勇 1等 .灰土挤密桩加固黄土隧道受力与变形性状分析[J]  现代隧道技术, 2020,V57(2): 86-95
SHAN Chao1, 2 GAN Lu2, 3 WANG Yadong2 CAO Xiaoyong1 etc .Analysis of Mechanical Behaviors and Deformation Characteristics of the Loess Tunnel Reinforced by Lime-soil Compaction Piles[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(2): 86-95
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2020/V57/I2/86
 
没有本文参考文献
[1] 马 辉 1 高明忠 2.基于系统工程方法论的川藏铁路隧道工程建设管理探讨[J]. 现代隧道技术, 2020,57(3): 1-8
[2] 王明年 1,2 郭晓晗 1,2 于 丽 1,2 李春荟 1,2 陈树汪 3.高海拔特长铁路隧道紧急救援站位置选型研究[J]. 现代隧道技术, 2020,57(3): 9-14
[3] 李 畅 1,2,3 王 刚 1,2 仇文革 1,2,3 龚 伦 1,2 赵迎春 4 王秋会 4.限阻器在高水平地应力隧道支护中的研究与应用[J]. 现代隧道技术, 2020,57(3): 15-29
[4] 廖 军 1 董 谦 1 梁洪永 2 简 波 2 石豫川 1,3 龚洪苇 1.近水平红层公路隧道围岩分级指标初探[J]. 现代隧道技术, 2020,57(3): 25-29
[5] 卢 松 1,2 汪 旭 1,2 李苍松 1,2 孟 露 1,2.应用HSP法的TBM隧道施工地质预报技术研究[J]. 现代隧道技术, 2020,57(3): 30-35
[6] 钟祖良 1,2 高国富 1,2 陈 鹏 1 严 如 1.重庆两江船舶观光隧道设计方案探讨[J]. 现代隧道技术, 2020,57(3): 36-42
[7] 黄福杰 何则干 张为民 刘珊珊.BIM技术在沉管隧道工程设计中的应用研究[J]. 现代隧道技术, 2020,57(3): 43-48
[8] 唐晓松 1,2 郑颖人 3 王永甫 1.有限元强度折减法在隧道施工稳定分析与控制中的应用[J]. 现代隧道技术, 2020,57(3): 49-55
[9] 吴 波 1, 2 兰扬斌 1,2 杨仕升 1,2 杨建新 3 庞晓瑜 3.基于强度折减动力分析法的围岩稳定性研究[J]. 现代隧道技术, 2020,57(3): 56-64
[10] 周翠英 1, 2 李 昂 2,3 刘 镇 1,2.平行褶皱构造对隧道围岩变形的影响研究[J]. 现代隧道技术, 2020,57(3): 65-74
[11] 马 莉 1 刘亚朋 2 李 盛 3,4 吕文达 5 谢 超 3,4 代金鹏 3,4.不同减载措施下高填黄土拱形明洞结构受力研究[J]. 现代隧道技术, 2020,57(3): 75-84
[12] 张丙武 1 张 鹏 1 戴振华 2 吴银河 2 罗 卫 2.河底地铁盾构隧道管片受力特征分析[J]. 现代隧道技术, 2020,57(3): 85-90
[13] 隋 心 1 张正维 1 闵 绚 2 DOWNIE Steven 3 PADHANI Shahid3 赵丽博 4.超长GIL综合管廊SF6气体泄露模拟研究[J]. 现代隧道技术, 2020,57(3): 91-98
[14] 张珂峰.前伏溶洞巷道开挖突水数值模拟研究[J]. 现代隧道技术, 2020,57(3): 99-107
[15] 张 研 1, 2 王 伟 2 邓雪沁 2.基于相关向量机的TBM掘进速度预测模型[J]. 现代隧道技术, 2020,57(3): 108-114
Copyright 2010 by 现代隧道技术