西安地铁九号线区间“先隧后井”合理开挖方案研究

Study on the Reasonable Excavation Option of "Tunnel First before Shaft" for an Running Tunnel of Xi′an Metro Line 9

  • 摘要: 风井横通道穿越既有盾构隧道管片施工是“先隧后井”法施工的难点,选择合适的开挖层数、台阶间距及管片的破除方式对开挖面的稳定、邻近盾构隧道管片的安全及地表沉降控制是极为重要的。文章以西安地铁9号线某区间为工程背景,构建“先隧后井”法施工的3D有限元模型,并根据地表沉降实测值,进行盾构隧道掘进过程的追踪模拟和地层参数反演分析。结果表明:采用分层分台阶留核心土方法来开挖横通道较为合理,其中开挖层数建议为4层,台阶间距建议为3 m,在横通道掘进穿过既有盾构隧道管片时,应先破除与横通道交界处两侧管片,再破除中间部位管片,且在破除管片前应放松影响区内管片之间的连接螺栓,减少对管片的纵向和环向破坏。

     

    Abstract: The difficulty for the "tunnel first before shaft" construction method is the construction of the cross pas? sage of the air shaft through the existing shield tunnel segments. It′ s extremely important to choose the appropriate number of excavation benches, bench spacing and breaking method of the segments for the stability of the excavation face, the safety of the adjacent shield tunnel segments and the control of the ground settlement. This paper takes a running tunnel of Xi′an Metro Line 9 as the engineering background, establishes a 3D finite element model for the construction method of "tunnel first before shaft", and carries out tracking simulation of shield tunnelling process and inverse analysis of ground parameters based on the measured ground settlement. The results show that it is quite reasonable to adopt the bench construction method with reserved core soil to excavate the cross passage, in which the number of excavation benches is recommended to be 4 and the bench spacing is recommended to be 3 m. When the cross passage is excavated through the existing shield tunnel segments, the segments on both sides of the junction with the cross passage should be broken first before the segments in the middle, and the joint bolts between the segments in the affected area should be loosened before breaking the segments, so as to reduce the longitudinal and circumferential failures of the segments.

     

/

返回文章
返回