现代隧道技术 2022, Vol. 59 Issue (3) :265-274    DOI:
规划设计与施工 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
地铁车站双层初期支护拱盖法施工过程力学行为研究
(1.中铁四局集团有限公司第七工程分公司,合肥 230022;2.西南交通大学土木工程学院,成都 610031)
Study on the Mechanical Behavior of the the Double-layer Arch Cover Initial Support during the Construction of Subway Stations by Arch-cover Method
(1. The Seventh Engineering Co., Ltd. of CTCE Group, Hefei 230022; 2. School of Civil Engineering, Southwest Jiaotong University,Chengdu 610031)
Download: PDF (6966KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 拱盖法目前已有较为广泛的推广及应用,现有研究均认识到拱盖是施工的关键,但缺少对施工过程力学行为的深入研究。基于此,以青岛地铁2号线西延段小港站标准段为工程依托,采用数值模拟和现场监测相结合的方法,对“双层初期支护拱盖法”施工过程的力学行为进行研究,重点关注临时竖撑拆除时的力学效应。结果表明:双层拱盖体系充分利用了下层较硬岩土体的承载作用,有效地控制了地表沉降和围岩变形;拆除竖撑前,拱顶压力主要由临时竖撑和第一层拱盖承担,拆除竖撑后,拱顶再次下沉,体系发生应力转换,两层拱盖最终进入协同工作阶段;从最终结果来看,双层拱盖法满足安全施工的要求,已在小港站的施工中得到验证,实现了浅埋大跨度地下结构快速安全施工。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
隗志远 1 冯冀蒙 2 虞龙平 2
关键词地铁车站   双层初期支护拱盖法   数值模拟   现场监测   施工力学     
Abstract: The arch-cover method has been widely promoted and practiced, and extant studies have recognized the arch cover as the key to construction. However, there has been a lack of in-depth research on its mechanical behavior during construction by the arch-cover method. In view of this, based on the standard section of the Xiaogang Station on the west extension of Qingdao Metro Line No. 2, this paper studies the mechanical behavior involved in "doublelayer initial support arch-cover method" during construction by combining numerical simulation and field monitoring, with a focus on the mechanical effect when the temporary vertical bracing is removed. The results show that the double-layer arch-cover system makes full use of the bearing effect of the underlying hard rock and soil body to effectively control the ground settlement and surrounding rock deformation; Before the removal of the vertical bracing,the pressure on the arch is mainly borne by the temporary vertical bracing and the first layer of the arch cover; after the removal, the arch sank again, while the system underwent a stress conversion, and the two layers of the arch cover eventually enter a phase of synergistic work. The findings show that the double-layer arch-cover method meets the requirements of safe construction as verified in the construction of the Xiaogang Station, and makes it possible to realize the rapid and safe construction of the shallow large-span underground structure.
KeywordsSubway station,   Double-layer initial support arch-cover method,   Numerical simulation,   Site monitoring,   Construction mechanics     
作者简介: 隗志远(1981-),男,高级工程师,主要从事地下空间工程建造技术相关研究和管理工作,E-mail:33946263@qq.com. 通讯作者:冯冀蒙(1986-),男,讲师,硕士生导师,主要从事复杂地下空间工程建造理论研究工作,E-mail:fengjm@swjtu.edu.cn.
引用本文:   
隗志远 1 冯冀蒙 2 虞龙平 2 .地铁车站双层初期支护拱盖法施工过程力学行为研究[J]  现代隧道技术, 2022,V59(3): 265-274
WEI Zhiyuan1 FENG Jimeng2 YU Longping2 .Study on the Mechanical Behavior of the the Double-layer Arch Cover Initial Support during the Construction of Subway Stations by Arch-cover Method[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(3): 265-274
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2022/V59/I3/265
 
没有本文参考文献
[1] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[2] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[3] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[4] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[5] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
[6] 贾永刚1 郝子晗1 鲁卫东1 吴 帆1 阳卫卫2.钢纤维混凝土管片不同接头型式力学性能研究[J]. 现代隧道技术, 2025,62(4): 182-196
[7] 罗 龙1 朱开宬2 韩瑀萱3 蔡 东4 刘哲奇5 王 俊6.超大断面隧道施工工法优化研究 ——以天邛高速公路梨花山隧道工程为例[J]. 现代隧道技术, 2025,62(4): 273-282
[8] 葛正辉1 郑建国1 李新志2 陈 鹏3 宁志玮2 王鹏程2.不同形式拱架初期支护变形规律实测与数值研究[J]. 现代隧道技术, 2025,62(3): 40-49
[9] 胡云进1,,2,3 朱铭伟1,2,3 郜会彩1,2,3 任智豪1,2,3.地下水渗流对能源盾构隧道换热性能的影响[J]. 现代隧道技术, 2025,62(3): 50-59
[10] 李玉华1 高亚伟1 钟秋锋1 秦丽绚2 李俊杰2 程志明2 黄永辉2.不同掏槽孔角度下隧道楔形掏槽爆破效果研究[J]. 现代隧道技术, 2025,62(3): 108-116
[11] 李瀚源1,2 冯 劲1 郭洪雨1 谢雄耀2 周红升1 孙 飞1.海底盾构隧道双层衬砌结构联合承载力学特性研究[J]. 现代隧道技术, 2025,62(3): 126-138
[12] 苏 恒1 王士民1 朱旭红2 秦善良3.考虑空间效应的盾构刀具切削桩基主筋力学特征研究[J]. 现代隧道技术, 2025,62(3): 139-150
[13] 程建华1,2 翁应康1 叶亚齐1,2 杨小林1,2 严文荣3 郭瑞静1.高压燃气管道泄漏爆炸对下伏地铁车站顶板结构的影响研究[J]. 现代隧道技术, 2025,62(3): 151-159
[14] 王帅帅1 傅一帆2,3 徐 勇1 史经峰1 郭 春2,3.通过接力风机进行风量分配的隧道施工风仓式通风参数研究[J]. 现代隧道技术, 2025,62(3): 240-248
[15] 陈云尧.长江一级阶地盾构始发下穿既有地铁车站风险应对措施及掘进分析[J]. 现代隧道技术, 2025,62(3): 249-258
Copyright 2010 by 现代隧道技术