[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2023, Vol. 60 Issue (3) :1-13    DOI:
理论研究与探讨 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
吸能锚杆及其静动力试验方法研究综述
(1.西安建筑科技大学土木工程学院,西安 710055;2.陕西省岩土与地下空间工程重点实验室,西安 710055; 3.西安建筑科技大学 隧道与地下结构工程研究所,西安 710055;4.中铁二十五局集团第四工程有限公司,柳州 545007)
A Review of Study on Energy-absorbing Rockbolts and Static/Dynamic Test Methods
(1. School of Civil Engineering of Xi′an University of Architecture and Technology, Xi′an 710055; 2. Shaanxi Key Laboratory of Geotechnical and Underground Space Engineering, Xi′an 710055; 3. Tunnel and Underground Structure Engineering Research Institute of Xi′an University of Architecture and Technology, Xi′an 710055; 4. China Railway No.25 Engineering Group No.4 Engineering Co., Ltd., Liuzhou 545007)
Download: PDF (7252KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为解决深部隧道、巷道等地下工程开挖时面临的软岩大变形及岩爆支护问题,在过去几十年里,研究人员提出了具有不同变形吸能机制的吸能锚杆,同时提出了量化吸能锚杆静动力性能的试验方法与试验设备,取得了大量的研究成果。对现有吸能锚杆的能量吸收机制、工作性能及其静动力性能试验方法等进行总结,根据吸能锚杆的工作机理,将吸能锚杆分为材料变形型吸能锚杆和结构变形型吸能锚杆两类,系统介绍了吸能锚杆静力拉伸与动力冲击的试验方法及设备;根据不同的吸能特性及变形能力,将吸能锚杆的性能划分为低、中、高和极高四种类型,并对吸能锚杆的应用前景和研究方向进行展望和总结。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
宋战平 1
2
3 许晓静 1
2 刘 伟 1
2 李凌峰 4
关键词隧道与地下工程   吸能锚杆   试验方法   静动力性能     
Abstract: In order to solve the problem of large deformation of soft rock and the support problem caused by rock? burst in underground works such as deep tunnels and galleries, researchers have devised the energy-absorbing rockbolts with various deformation energy-absorbing mechanisms in the past few decades, and they have also devised the testing methods and equipment that can quantity the static and dynamic performance of energy-absorbing rockbolts, with many research achievements. In review of the energy-absorbing mechanisms, working performance and static/dynamic performance test methods of the existing energy-absorbing rockbolts and based on the working mechanism of energy-absorbing rockbolt, the energy-absorbing rockbolts can be classified into two types, i.e. material deformation energy-absorbing rockbolt and structural deformation energy-absorbing rockbolt. The testing methods and equipment used for static tension and dynamic impact tests of energy-absorbing rockbolt are systematically explained. Depending on their energy-absorbing properties and deformation capacity, the performance of energy-absorbing rockbolt can be classified as low, medium, high or very high. The application prospect of energy-absorbing rockbolt and its direction research have been examined and predicted.
KeywordsTunnel and underground works,   Energy-absorbing rockbolt,   Test method,   Static/dynamic performance     
基金资助:国家自然科学基金(52178393);陕西省创新能力支持计划(2020TD-005);陕西省杰出青年科学基金(2022JC-20).
作者简介: 宋战平(1974-),男,博士,教授,主要从事岩土工程、地下工程等领域的教学与科研工作,E-mail:songzhpyt@xauat.edu.cn.
引用本文:   
宋战平 1, 2, 3 许晓静 1等 .吸能锚杆及其静动力试验方法研究综述[J]  现代隧道技术, 2023,V60(3): 1-13
SONG Zhanping1, 2, 3 XU Xiaojing1 etc .A Review of Study on Energy-absorbing Rockbolts and Static/Dynamic Test Methods[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(3): 1-13
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2023/V60/I3/1
 
没有本文参考文献
没有找到本文相关文献
Copyright 2010 by 现代隧道技术