现代隧道技术 2024, Vol. 61 Issue (2) :223-231    DOI:
重大工程案例 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
胶州湾第二海底隧道工程挑战与技术创新
(青岛国信发展(集团)有限责任公司,青岛 266071)
Challenges and Technological Innovations in the Jiaozhou Bay Second Submarine Tunnel Project
(Qingdao Guoxin Development (Group) Co., Ltd., Qingdao 266071)
Download: PDF (7817KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 青岛胶州湾第二海底隧道是世界上最长海底道路隧道工程,采用钻爆法+盾构法组合工法施工,线路总长17.5 km,最深点距海平面约115 m,海底断裂带、风化深槽、软弱破碎带等灾害源广布,已探明构造带22条,是目前世界上建设规模最大、长度最长的海底隧道超级工程。项目建设面临“三大四极”的工程重难点,为此,项目开展了多项引领性设计施工与创新技术探索。文章回顾了海底隧道建设的历程与经验,阐述了胶州湾第二海底隧道建设面临的问题和思考,旨在为后续类似的工程建设提供参考和借鉴。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
曲立清
关键词胶州湾   超长海底隧道   组合工法施工   大型机械化配套施工     
Abstract: The Qingdao Jiaozhou Bay Second Subsea Tunnel is the world's longest subsea road tunnel project, constructed using a combination of drilling + blasting and shield tunnelling methods. The total length of the tunnel is 17.5 km, with the deepest point about 115 m below sea level. The area is fraught with geological challenges, including submarine fault zones, deeply weathered troughs, and weak fractured zones, with 22 identified tectonic zones, making it the largest and longest undersea tunnel mega project in the world to date. The project faced significant engineering challenges, described as "three majors and four extremes," and undertook numerous leading-edge technological innovations in design and construction. This paper reviews the construction history and experiences of subsea tunnels and addresses the challenges and considerations in the construction of the Jiaozhou Bay Second Subsea Tunnel,aiming to provide references and insights for similar future engineering projects.
KeywordsJiaozhou Bay,   Ultra-long subsea tunnel,   Combined construction method,   Large-scale mechanized con? struction support     
作者简介: 曲立清(1965-),男,硕士,研究员,总工程师,主要从事隧道及地下工程科研及管理工作,E-mail:qdqlqing@sina.com.
引用本文:   
曲立清 .胶州湾第二海底隧道工程挑战与技术创新[J]  现代隧道技术, 2024,V61(2): 223-231
QU Liqing .Challenges and Technological Innovations in the Jiaozhou Bay Second Submarine Tunnel Project[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(2): 223-231