[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2024, Vol. 61 Issue (6) :21-28    DOI:
理论研究与探讨 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
楔形掏槽爆破槽腔内岩块运动规律研究
(1.福州大学紫金地质与矿业学院,福州 350116;2.福州大学爆炸技术研究所,福州 350116;3.福建省交通科研院有限公司,福州 350004)
Study on the Movement Law of Rock Blocks inside the Cavity in Wedge Cut Blasting
(1. Zijin School of Geology and Mining, Fuzhou University, Fuzhou 350116; 2. Institute of Explosion Technology, Fuzhou University,Fuzhou 350116; 3. Fujian Province Traffic Academy Co., Ltd., Fuzhou 350004)
Download: PDF (5679KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为研究隧道掏槽爆破中楔形槽腔内部岩块运动规律,并确定合理的楔形掏槽延期时间,首先基于合理的假设建立楔形掏槽爆破岩块抛掷过程理论模型,然后采用一维不定常流理论和牛顿第二定律来求解不同设计参数下楔形槽腔内岩块运动时程曲线。运用SPH-FEM耦合数值模型验证槽腔内岩块运动规律推导的合理性,并分析不同孔网参数下待爆岩体抛掷过程,以及槽腔内岩块抛掷特征和运动规律。结果表明,在第一楔掏槽深度为2.0 m时,软岩、中等坚硬岩和坚硬岩的第一楔槽腔形成时间分别为32.68~35.66 ms、33.10~36.45 ms和34.4~38.22 ms,“二阶二段”楔形掏槽孔的延期时间设计需要大于以上槽腔形成时间。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
吴国宾1
2 陈必港3 陈治伙3 廖大刚3 楼晓明1
2 曾华恒1
2
关键词隧道爆破   楔形掏槽力学模型   牛顿第二定律   SPH-FEM   抛掷运动   延期时间     
Abstract: To study the movement law of rock blocks inside the wedge cut cavity in tunnel blasting and to determine the reasonable delay time for wedge cutting, a theoretical model of the rock block throwing process in wedge cut blasting was established based on reasonable assumptions. The time-history curves of rock block movement inside the wedge cut cavity under different design parameters were solved using the one-dimensional unsteady flow law and Newton's second law. The SPH-FEM coupled numerical simulation was used to verify the rationality of the derived movement law of rock blocks inside the cavity and the throwing process of the rock blocks to be blasted under different hole network parameters, as well as the throwing characteristics and movement law of rock blocks in the cavity. The results indicate that when the first wedge cut depth is 2.0 meters, the reasonable delay time for the second wedge cut hole in soft rocks, medium-hard rocks, and hard rocks is 32.68-35.66 ms, 33.10-36.45 ms, and 34.4-38.22 ms, respectively. The designed delay time for the "two-step" wedge cutting needs to be greater than the above-mentioned cavity formation time.
KeywordsTunnel blasting,   Mechanical model of wedge cutting,   Newton's second law,   SPH-FEM,   Throwing mo? tion,   Delay time     
基金资助:国家自然科学基金(52109124).
作者简介: 吴国宾(1997-),男,硕士研究生,主要从事矿山及隧道爆破方面的研究工作,E-mail: bestwgb0612@163.com. 通讯作者:楼晓明(1972-),男,博士,教授,主要从事矿山及隧道爆破方面的研究与教学工作,E-mail:331261323@qq.com.
引用本文:   
吴国宾1, 2 陈必港3 陈治伙3 廖大刚3 楼晓明1, 2 曾华恒1等 .楔形掏槽爆破槽腔内岩块运动规律研究[J]  现代隧道技术, 2024,V61(6): 21-28
WU Guobin1, 2 CHEN Bigang3 CHEN Zhihuo3 LIAO Dagang3 LOU Xiaoming1, 2 ZENG Huaheng1 etc .Study on the Movement Law of Rock Blocks inside the Cavity in Wedge Cut Blasting[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(6): 21-28
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2024/V61/I6/21
 
没有本文参考文献
Copyright 2010 by 现代隧道技术