基于模糊二维云概率模型的隧道突水涌泥动态风险评估
(1.长电(张掖)能源发展有限公司,张掖 734000;2.中国电建集团西北院勘测设计研究院有限公司, 西安 710065;3.中国水利电力对外有限公司,北京 101100;4.同济大学土木工程学院地下建筑与工程系, 上海 200292)
Dynamic Risk Assessment of Water Inrush and Mud Burst in Tunnels Based on Fuzzy Two-dimensional Cloud Probability Model
(1. Changdian (Zhangye) Energy Development Co. Ltd., Zhangye 734000; 2. Power China Northwest Engineering Corporation Limited,Xi'an 710065; 3. China International Water & Electric Corp., Beijing 101100; 4. Department of Geotechnical Engineering College of Civil Engineering, Tongji University, Shanghai 200292)
Download: PDF (3790KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  隧道施工期间地下水环境具有高度的动态性,采用一维云模型难以全面反映多维复杂地质环境下隧道施工风险的不确定性。基于此,结合二维云模型和模糊数学理论,通过概率算法构建隧道突水涌泥风险的动态评估模型。该模型从风险后果的严重性和发生的可能性两个维度出发,采用模糊数学正态分布隶属度函数对传统风险矩阵进行量化转换,引入偏离度代替隶属度进一步改进二维云模型,通过采集多源数据和分析专家系统生成云滴 的分布情况来反映风险的不确定性,量化风险概率,从而判定风险等级和预警状态。工程应用结果表明,该方法能够随着隧道施工的推进,动态更新孕险环境信息,实时评估突泥涌水风险。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
丁万钦1 刘 源2 王文东1 周耘辛3 李海兵2 芮 易4
关键词二维云模型   模糊数学理论   动态风险评估   多源数据融合   不确定性     
Abstract: The groundwater environment during tunnel construction is highly dynamic, making it challenging to fully capture the uncertainties of tunnel construction risks under complex multidimensional geological conditions using a one-dimensional cloud model. To address this, a dynamic evaluation model for water inrush and mud burst risks in tunnels is proposed, combining a two-dimensional cloud model with fuzzy mathematics theory and probabilistic algorithms. The model evaluates risks from two dimensions: severity of consequences and likelihood of occurrence. A fuzzy mathematics normal distribution membership function is used to quantify and transform the traditional risk matrix. Deviation degree is introduced to replace membership degree, further improving the two-dimensional cloud model. Multi-source data acquisition and expert system are used to generate cloud droplets, whose distribution reflects risk uncertainty and quantifies risk probabilities. This approach enables the determination of risk levels and early warning states. Engineering application results demonstrate that this method dynamically updates risk environment information as tunnel construction progresses and provides real-time assessments of water and mud inrush risks.
KeywordsTwo-dimensional cloud model,   Fuzzy mathematics,   Dynamic risk assessment,   Multi-source data fusion; Uncertainty     
基金资助:国家自然科学基金(52378406).
作者简介: 丁万钦(1980-),男,硕士,高级工程师,主要从事水电工程建设、运维管理及技术管理方面的工作,E-mail: ding_wanqin@ ctg.com.cn. 通讯作者:芮 易(1984-),男,博士,教授,主要从事能源地下工程、地下基础设施智慧感知和岩土计算力学方面的研究与教学工作,E-mail:ruiyi@tongji.edu.cn.
引用本文:   
丁万钦1 刘 源2 王文东1 周耘辛3 李海兵2 芮 易4 .基于模糊二维云概率模型的隧道突水涌泥动态风险评估[J]  现代隧道技术, 2024,V61(6): 261-268
DING Wanqin1 LIU Yuan2 WANG Wendong1 ZHOU Yunxin3 LI Haibing2 RUI Yi4 .Dynamic Risk Assessment of Water Inrush and Mud Burst in Tunnels Based on Fuzzy Two-dimensional Cloud Probability Model[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(6): 261-268
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2024/V61/I6/261
 
没有本文参考文献
Copyright 2010 by 现代隧道技术