[an error occurred while processing this directive]
|
现代隧道技术 2012, Vol. 49 Issue (1) :44-49 DOI: |
|
||||
| 沉管隧道管节沉放实时定位测量技术现状分析 | ||||
| (1 中交第四航务工程局有限公司,广州 510230; 2 中交四航工程研究院有限公司,广州 510230) | ||||
| The State of Real-Time Positioning Measurement Technology for Immersed Tunnels | ||||
| (1 CCCC Fourth Harbor Engineering Co, Ltd., Guangzhou 510230; 2 CCCC Fourth Harbor Engineering Institute Co.,Ltd.,Guangzhou 510230) |
||||
|
||||||||||||||||||||||||||||||||||
Copyright 2010 by 现代隧道技术
|