[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2012, Vol. 49 Issue (6) :82-87    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
基于NNBR模型的纵向地表沉降动态预测
上海建工集团股份有限公司技术中心,上海  200431
Dynamic Prediction of Longitudinal Surface Settlement based on the NNBR Model
Technical Center of Shanghai Construction Engineering Group Incorporated Company
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要      针对现有预测地表沉降方法的不足,结合土压平衡式盾构一个掘进周期中不同阶段引起地表沉降的状况不同,提出了应用最近邻抽样回归模型(NNBR模型)对纵向地表沉降进行动态预测的方法。文章初步总结出土舱压力和平均掘进速度、注浆压力和平均掘进速度、监测时间可分别作为开挖面前方变形、盾尾空隙沉降、固结沉降三个阶段的主要预测因子,列出了相应阶段的相似计算公式。利用该方法对一工程实例的固结沉降阶段进行了预测,在样本数较少的情况下,预测结果最大相对误差只有14.04%,从而论证了基于NNBR模型的动态预测方法的准确性和可行性。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
王红卫
关键词最近邻抽样回归模型     盾构法        地表沉降      动态预测     
Abstract: Because the surface settlements are different in different stages of an excavation cycle by an EPB shield, and some defects exist in the current prediction methods, this paper discusses the dynamic prediction method for longitudinal surface settlement using the nearest neighbor bootstrap regressive model (NNBR model). Soil pressure and average driving speed, grouting pressure and average driving speed, and monitoring time are considered to be the main predictiors of surface settlement in front of the excavation face, gap settlement at the shield tail, and consolidation settlement. Similarly, calculation formulas for corresponding stages are presented. The consolidation settlement in one case was predicted by the above method, with the maximum relative error of 14.04%, which demonstrates the accuracy and feasibility of the dynamic prediction method based on NNBR model.
Keywords:   
出版日期: 2012-03-20
基金资助:
基金项目:超大规模地下空间绿色施工技术(11dz1201503)
作者简介: 作者简介:王红卫(1974-),男,博士研究生,主要从事岩土工程风险研究等,E-mail:wang_hongwei2011@163.com
引用本文:   
王红卫 .基于NNBR模型的纵向地表沉降动态预测[J]  现代隧道技术, 2012,V49(6): 82-87
WANG Hong-Wei .Dynamic Prediction of Longitudinal Surface Settlement based on the NNBR Model[J]  MODERN TUNNELLING TECHNOLOGY, 2012,V49(6): 82-87
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2012/V49/I6/82
 
没有本文参考文献
Copyright 2010 by 现代隧道技术