[an error occurred while processing this directive]
  | 
  
现代隧道技术   2013, Vol. 50   Issue (2) :46-51    DOI:                                                                                                      | 
  
      
  | 
  ||||
| 软弱围岩斜井转正洞工法动态施工力学行为分析 | ||||
| 西南交通大学土木工程学院 ,成都 610031 | ||||
| Analysis of Dynamic Mechanical Behavior During Construction from an Inclined Shaft to the Main Tunnel in Soft Surrounding Rock | ||||
(College of Civil Engineering, Southwest Jiaotong University, Chengdu 610031)  | 
  ||||
     
  | 
  ||||||||||||||||||||||||||||||||||
Copyright 2010 by 现代隧道技术 
      |