沉管隧道临时支承系统设计与施工控制

The Design and Construction Control for a Temporary Support System in an Immersed Tunnel

  • 摘要: 文章论述了沉管隧道管段临时支承系统的三点支承、四点支承、五点支承等几种主要形式,并进行了分析对比;同时介绍了五点式支承系统在越南西贡东西高速公路过江沉管隧道工程中的应用情况以及支承系统的设计与施工控制。研究结果及工程实践均表明:五点式支承系统在管段安装后始终能保证有三个支承点,可确保管段水下姿态稳定,同时具有更高的安装精度,尤其适合线路长、管段多的沉管隧道。

     

    Abstract: The main types of temporary support systems in immersed tunnels are described (i.e. three-point support, four-point support, and five-point support) and a comparative analysis is carried out. The five-point support system was applied to the river-crossing tunnel of the East-West Expressway in Saigon, Vietnam, and its design and construction control are introduced in this paper. Research results and practice show that this five-point support system can ensure that the elements are supported by at least three points and guarantee element stability and accuracy under water, especially for a long immersed tunnel with enormous elements.

     

/

返回文章
返回