高应力软岩隧道超前导洞法应力释放试验研究
(1  蒙西华中铁路股份有限公司,北京  100070;
2  太中银铁路有限责任公司,西安  710000;3  中国铁路总公司工程管理中心,北京  100844)
Experimental Study of Stress Release Using a Pilot Heading
for a Highly Stressed Soft-Rock Tunnel
(1  Mengxi-Huazhong Railway Co. Ltd., Beijing  100070;
2  Taiyuan-Zhongwei-Yinchuan Railway Co. Ltd., Xi'an  730050;
3  Engineering Management Centre, China Railway Corporation, Beijing  100844)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  隧道穿越高地应力软弱围岩时,常常发生大变形地质灾害。隧道大变形灾害危害程度极大,主要表现为处理风险大、整治费用高、工期被延误。预防和治理高应力软岩隧道大变形是隧道工程界的一个重难问题。文章通过在兰渝铁路木寨岭隧道和毛羽山隧道进行超前导洞应力释放试验,得出了超前导洞法应力释放对大变形的控制作用。试验结果表明,在隧道内设置的超前导洞与隧道拱顶及边墙距离约3m左右时,超前导洞一般在3~7 d内达到应力释放效果;与不采用超前导洞法相比,正洞扩挖时变形量可减少约30%~40%。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词高应力软岩隧道      超前导洞      应力释放     
Abstract:  Geological disasters causing large deformations often occur when a tunnel passes through highly stressed soft rock. Such a disaster is greatly harmful to a project in terms of high risk treatments, expensive maintenance costs, and a delayed construction time. Therefore, preventing and treating the large deformation of a highly stressed soft-rock tunnel is a key and complex issue in tunnel engineering. Based on tests in the Muzhailing and Maoyushan tunnels on the Lanzhou-Chongqing railway, it was found that stress release by pilot heading can control large deformations. The stress is released within 3~7 days if the pilot tunnel is about 3m away from the tunnel crown and sidewalls. Additionally, the deformation of the main tunnel can be reduced by nearly 30%~40% compared to projects without pilot tunnels during the enlarging excavation.
Keywords ,   Tunnel in highly stressed soft rock,   Pilot heading,   Stress release      
出版日期: 2013-05-21
作者简介: 张 梅(1958- ),男,教授级高级工程师,主要从事铁路建设管理与隧道施工技术研究,E-mail:zhangmei_2008@163.com.
引用本文:   
.高应力软岩隧道超前导洞法应力释放试验研究[J]  现代隧道技术, 2013,V50(4): 68-75
.Experimental Study of Stress Release Using a Pilot Heading
for a Highly Stressed Soft-Rock Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2013,V50(4): 68-75
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2013/V50/I4/68
 
没有本文参考文献
Copyright 2010 by 现代隧道技术