碳质板岩隧道塌方处理方案探讨
(中铁七局集团第一工程有限公司,洛阳 471000)
Discussion of the Treatment of Collapse in a Tunnel Passing Through Carbonaceous Slate
(The First Engineering Co. Ltd., of China Railway Seventh Group Co. Ltd., Luoyang 471000)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  文章结合十堰—天水高速公路磨河村隧道塌方案例,分析了隧道塌方原因,并从经济性、安全性、可操作性等方面综合比较了三个处理方案。最终选择的处理方案为:利用弃碴回填下台阶;加固上台阶开挖台车,以作为防护棚架;对坍塌前后段及坍塌口进行加固处理,施做喷混凝土支护及二次衬砌;利用混凝土及干砂对塌腔进行回填处理。该处理方案安全、合理、经济、快速、可行,且效果良好。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
冯迎军
关键词 高速公路隧道   碳质板岩 塌方处理     
Abstract: Based on the Mohecun tunnel on the Shiyan-Tianshui expressway, this paper analyzes the causes for its collapse and compares three treatment schemes in terms of economy, safety and maneuverability. The chosen scheme, in which the lower bench is backfilled with muck; the working platform for upper bench excavation is strengthend as a protective scaffolding; reinforcement is carried out at the front and back sections of the collapse as well as at the collapsed section; sprayed concrete and a secondary lining are applied and the collapsed cavity is backfilled with concrete and dry sand, is proven to be safe, rational, economic, rapid, feasible and effective.
KeywordsExpressway,   Tunnel;Carbonaceous slate,   Collapse treatment measures     
出版日期: 2013-11-24
作者简介: 作者简介: 冯迎军(1973-),男,高级工程师,主要从事土木工程管理工作,E-mail:wukangerxianfyj@163.com
引用本文:   
冯迎军 .碳质板岩隧道塌方处理方案探讨[J]  现代隧道技术, 2014,V51(2): 178-181
FENG Ying-Jun .Discussion of the Treatment of Collapse in a Tunnel Passing Through Carbonaceous Slate [J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(2): 178-181
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2014/V51/I2/178
 
没有本文参考文献
Copyright 2010 by 现代隧道技术