[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2015, Vol. 52 Issue (2) :148-154    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
高水压条件下钢顶管管节密封性试验及数值模拟研究
中铁十八局集团有限公司
Sealing Test and Numerical Simulation for Steel Jacking Pipe Joint under High Water Pressure
China Railway 18 Bureau Co., Ltd
Download: PDF (1025KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 钢顶管是大部分超大型顶管管幕施工的基础和关键技术。在复杂地层条件和高地下水压力环境下,钢顶管管节密封结构的密封性能至关重要。文章以港珠澳大桥拱北隧道曲线顶管管幕工程为背景,针对钢顶管管节密封性能进行了室内模型试验和ABAQUS有限元模拟。结果表明,采用两道鹰嘴形橡胶密封圈的管节接头可以满足现场抵抗0.3 MPa水压的施工密封要求;在0.1~1.0 MPa水压力作用下橡胶圈与插口的最大接触压力均大于施加的水压力,橡胶密封圈不会失效。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词顶管    高地下水压力    密封性试验    鹰嘴橡胶圈     
Abstract: Steel pipe jacking is the foundation and key technology of most large pipe-roofing construction. And yet facing with the complex formation and high groundwater pressure, sealing property of leakproof structure of jacking pipe joint is of great importance. In this paper, laboratory model experiment and ABAQUS finite element modeling are carried out regarding the sealing property of steel jacking pipe joints in the curved pipe-roof section of the Gongbei Tunnel of HongKong-Zhuhai-Macau Bridge. The results show that the pipe joint with two olecranon-shaped rubber sealing rings is capable of withstanding 0.3 MPa water pressure and meeting the in-situ construction sealing requirements; the maximum contact pressure between the rubber ring and the joint socket under pressure of 0.1~1.0 MPa is greater than the applied water pressure, which means the rubber ring will be not invalidated.
KeywordsPipe-jacking  ,   High groundwater pressure  ,   Sealing test  ,   Olecranon-shaped rubber ring     
作者简介: 高海东(1974-),男,高级工程师,主要从事隧道工程施工与管理工作, E-mail: ghd740420@sina.com
引用本文:   
.高水压条件下钢顶管管节密封性试验及数值模拟研究[J]  现代隧道技术, 2015,V52(2): 148-154
.Sealing Test and Numerical Simulation for Steel Jacking Pipe Joint under High Water Pressure[J]  MODERN TUNNELLING TECHNOLOGY, 2015,V52(2): 148-154
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2015/V52/I2/148
 
没有本文参考文献
Copyright 2010 by 现代隧道技术