Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2025, Vol. 62 Issue (5) :43-    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on Non-limit Active Earth Pressure Distribution of Deep Large Circular Excavations Considering Groundwater and Spatial Soil Arching Effects
(1. School of Aeronautics and Astronautics, Sun Yat-Sen University, Shenzhen 518107; 2. State Key Laboratory for Tunnel
Engineering, Guangzhou 510275; 3. Guangdong Key Laboratory of Marine Civil Engineering, School of Civil Engineering,
Sun Yat-sen University, Guangzhou 510275; 4. Guangzhou Metro Construction Management Co., Ltd., Guangzhou 510000; 
5. Guangdong Construction Engineering Co.Ltd of China Railway Third Group, Guangzhou 510000)
Download: PDF (3525KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract With the increasing application of deep and large circular excavations, developing an earth pressure evaluation method that comprehensively accounts for complex influencing factors is of significant engineering value for enhancing design accuracy and scientific reliability. In this study, a non-limit active earth pressure calculation method for circular excavations is proposed, which incorporates groundwater effects, spatial arching effects, and wall displacement patterns. The applicability and effectiveness of the method are validated through an engineering case study. Furthermore, the influences of soil parameters, wall displacement patterns, surface surcharge, and groundwater level on earth pressure distribution are investigated. The results show that the earth pressure in circular excavations first increases and then decreases with depth, and due to spatial arching effects, it is significantly lower than the traditional Rankine earth pressure estimation. The earth pressure is negatively correlated with soil cohesion and internal friction angle. Surface surcharge generates additional earth pressure on the upper portion of the wall, which decreases with depth. A lower groundwater level, larger wall displacement magnitude, and wider displacement zone result in a more significant reduction in active earth pressure.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LIANG Yu1
2
3 FAN Xiaofeng3 HUANG Linchong2
3 ZHOU Zhonghai4 MENG Tao5
KeywordsCircular excavation   Soil arching effect   Groundwater influence   Non-limit earth pressure     
Abstract: With the increasing application of deep and large circular excavations, developing an earth pressure evaluation method that comprehensively accounts for complex influencing factors is of significant engineering value for enhancing design accuracy and scientific reliability. In this study, a non-limit active earth pressure calculation method for circular excavations is proposed, which incorporates groundwater effects, spatial arching effects, and wall displacement patterns. The applicability and effectiveness of the method are validated through an engineering case study. Furthermore, the influences of soil parameters, wall displacement patterns, surface surcharge, and groundwater level on earth pressure distribution are investigated. The results show that the earth pressure in circular excavations first increases and then decreases with depth, and due to spatial arching effects, it is significantly lower than the traditional Rankine earth pressure estimation. The earth pressure is negatively correlated with soil cohesion and internal friction angle. Surface surcharge generates additional earth pressure on the upper portion of the wall, which decreases with depth. A lower groundwater level, larger wall displacement magnitude, and wider displacement zone result in a more significant reduction in active earth pressure.
KeywordsCircular excavation,   Soil arching effect,   Groundwater influence,   Non-limit earth pressure     
Cite this article:   
LIANG Yu1, 2, 3 FAN Xiaofeng3 HUANG Linchong2 etc .Study on Non-limit Active Earth Pressure Distribution of Deep Large Circular Excavations Considering Groundwater and Spatial Soil Arching Effects[J]  MODERN TUNNELLING TECHNOLOGY, 2025,V62(5): 43-
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2025/V62/I5/43
 
No references of article
[1] CAI Guangyuan.A Novel Active Earth Pressure Distribution Model Based on the Critical Depth of Soil Arching Effect[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 29-34
[2] CHEN Zhimin LIU Baoli CHEN Jun ZHAI Wenhao LI Wenhao WANG Duobin CAI Yunchen.Study on Arching Effect of Moraine Considering Grain Composition and Moisture Content[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 200-209
[3] SONG Yuepeng1 FAN Xiaofeng2 LIANG Yu2,3,4 PENG Hongguo5 ZHANG Hanwei5.Deformation Monitoring and Analysis during the Excavation of Deep Circular Shafts in Intercity Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 219-226
[4] HUANG Kan WU Qijiang DENG Xi LI Hui.Study on Loose Soil Pressure Calculation of Shield Tunnel Based on Linear Change of the Included Angle of Slip Surface[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 8-17
[5] MA Qianying YE Jiachao JIANG Xiaohui.Study on Ground Settlement Prediction in Shield Tunnel Construction Considering Soil Arching Effect[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 148-154
[6] YAO Yuxiang1 LI Sheng1 MA Li1 WANG Changdan2 ZUO Di3.DEM Analysis on Soil Arching Effect of Unloading Structure of High-Filled Open Cut Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 84-93
[7] MA Li1 LI Sheng2 WANG Qicai2 YU Bentian2 LIU Yapeng2 WANG Qingshi2.Study on Earth Pressure Difference Law of Load Relieving Structure of the Rectangular and Arched High-filled Loess Open Cut Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(6): 63-69
[8] .Calculation Method for Loosening Earth Pressure of a Shallow-Buried Tunnel Considering the Soil Arch Effect[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(4): 56-62
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY