Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2025, Vol. 62 Issue (5) :88-    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Rapid Improvement of High-altitude Sickness among Tunnel Construction Workers through a Gradual Intermittent Hypobaric Hypoxic Acclimatization Technique
(1. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031; 2. Key laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 3. Rehabilitation Medicine Center, West China Hospital, Sichuan University, Chengdu 610044; 4. China Railway ten Bureau Group Third Construction Co. Ltd, Hefei 230601)
Download: PDF (4673KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract To reduce the risk of high-altitude sickness in tunnel construction workers operating on plateaus, a gradual and intermittent hypobaric hypoxic acclimatization technique was proposed. In a stratified randomized controlled trial, eight healthy lowland residents were randomly assigned to either a control group or a hypoxic exposure group. A hypobaric hypoxic chamber was used to simulate a gradient altitude environment ranging from 2,500 m to 5,000 m. A 7-day resting exposure protocol was applied with 3 hours of daily training under a stepwise ascending altitude scheme. The results show that this acclimatization approach significantly reduces the incidence rate and severity of acute mountain sickness (AMS) based on Lake Louise Score (LLS). Resting blood oxygen saturation increased by 6.98%, heart rate decreased by 17.24%, and the compensatory elevation in tidal volume (VT) recovered close to the baseline level at sea level. This short-term, 7-day acclimatization protocol overcomes the prolonged duration required by traditional staged acclimatization strategies and effectively satisfies acclimatization demands for high-altitude tunnel construction.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
QIU Jiewen1
2 HUANG Cheng3 SU Ke4 ZHAO Shulei1
2 GUO Chun1
2
KeywordsHigh-altitude acclimatization   Worker health   Gradual intermittent hypoxic pre-acclimatization   Hypobaric hypoxic chamber   Tunnel construction     
Abstract: To reduce the risk of high-altitude sickness in tunnel construction workers operating on plateaus, a gradual and intermittent hypobaric hypoxic acclimatization technique was proposed. In a stratified randomized controlled trial, eight healthy lowland residents were randomly assigned to either a control group or a hypoxic exposure group. A hypobaric hypoxic chamber was used to simulate a gradient altitude environment ranging from 2,500 m to 5,000 m. A 7-day resting exposure protocol was applied with 3 hours of daily training under a stepwise ascending altitude scheme. The results show that this acclimatization approach significantly reduces the incidence rate and severity of acute mountain sickness (AMS) based on Lake Louise Score (LLS). Resting blood oxygen saturation increased by 6.98%, heart rate decreased by 17.24%, and the compensatory elevation in tidal volume (VT) recovered close to the baseline level at sea level. This short-term, 7-day acclimatization protocol overcomes the prolonged duration required by traditional staged acclimatization strategies and effectively satisfies acclimatization demands for high-altitude tunnel construction.
KeywordsHigh-altitude acclimatization,   Worker health,   Gradual intermittent hypoxic pre-acclimatization,   Hypobaric hypoxic chamber,   Tunnel construction     
Cite this article:   
QIU Jiewen1, 2 HUANG Cheng3 SU Ke4 ZHAO Shulei1, 2 GUO Chun1 etc .
Rapid Improvement of High-altitude Sickness among Tunnel Construction Workers through a Gradual Intermittent Hypobaric Hypoxic Acclimatization Technique
[J]  MODERN TUNNELLING TECHNOLOGY, 2025,V62(5): 88-
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2025/V62/I5/88
 
No references of article
[1] WANG Lichuan1,2 YAN Guangtian1 YUAN Wei GAO Hongbing4 LI Liping2 ZHANG Chunyu1,5 WU Jian4 ZHANG Long3.Development and Application of TBM-mounted Omni-directional and Normal Deep Anchor Hole Drilling Machine[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 67-74
[2] WANG Liuxun.Study on the Construction Equipment Configuration Scheme for Tunnelling under High Altitude, Low Oxygen Content and Low Atmospheric Pressure Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 259-265
[3] SANG Conghui1,2 QIAO Liwei1,2 WANG Lieni3 YUAN Wenchao4 ZHAO Yanfa5.High-precision Discrete Simulation Method of Floating Dusts Based on Two-stage Solution and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 203-211
[4] WANG Wei1,2 LI Xianmin1 SUN Xinhai1,2.Numerical Simulation Study on the Supporting Effect of Bolts in Interbedded Soft Rock Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 99-107
[5] WANG Zhijie1 LI Jinyi1 DENG Yuhang1 DU Yiwen1 ZHOU Ping1 BAI Xiaoke2 LI Fenggang2.On Defects and Disaster-causing Factors in Tunnelling in Salt Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 46-55
[6] HE Faliang.On the Problem of“Geologic Uncertainty”in Tunnelling and Its Solutions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 8-13
[7] HUANG Jifu XIAO Gongyi.Study on Practical Application and Adaptability of the Roadheader in Transportation Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 51-62
[8] SONG Junxiu1 WAN Xiaolin2 GUO Chun1.Study on Construction Ventilation Scheme of Air Cabin for An′ding Tunnel on Yumo Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 232-238
[9] LU Song1,2 WANG Xu1,2 LI Cangsong1,2 MENG Lu1,2.Study on Geological Prediction Technology of HSP Method for TBM Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 30-35
[10] YU Jianxin1 LIU Huanchun2 WEI Haixia1 CHEN Chen2.On Mutual Dynamic Effect of Tunnel Blasting Construction Adjacent to Existing Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(6): 85-92
[11] LI Yanzong ZHAO Shuang.Analysis on Construction Schemes and Deformation of Multi-layer Support Structure for a Soft Rock Tunnel under High Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 161-165
[12] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 106-114
[13] QU Haobo1,2 LI Lin2.Preliminary Analysis of Causes of Closing Type Blockage Disasters during Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 51-55
[14] ZHANG Tao.Rapid Construction Technique for a Large Upper-Section of the Tianping Tunnel in Soft Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(6): 203-209
[15] .Analysis of the Reliability of Advanced Geological Prediction during TunnelConstruction Based on the Attribute Recognition Theory[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(4): 48-55
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY