Research and Application of Key Construction Technologies for TBM-driven Tunnels under Extreme Complex Geological Conditions
(1. China Railway Tunnel Group Co., Ltd.,Guangzhou 511458 ; 2. State Key Laboratory of Shield Machine and Boring Technology,Zhengzhou 450001; 3. China Railway Tunnel Stock Co., Ltd., Zhengzhou 450001)
Download: PDF (3129KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract With successive construction commencement of the Gaoligongshan Tunnel of the Dali-Ruili Railway, the Qinling Tunnel of the Hanjiang-to-Weihe Water Diversion Project, and the Xianglushan Tunnel of the Central Yunnan Water Diversion Project, various TBM construction problems have become increasingly prominent, such as TBM jamming caused by water-rich, broken and extremely soft strata, and rockburst caused by extremely hard rock strata with high in-situ stress. Firstly, this paper compares and elaborates on the typical adverse geological conditions such as broken and soft rock, and extremely hard granite commonly encountered during the construction of TBM tunnels in China and their impacts on TBM boring. On the basis of summarizing and analyzing the tunnel collapse and TBM jamming cases, and their influencing factors during the construction of various projects such as the Liaoning northwest water supply project, the songhua river water diversion project, and the tao river water supply project, this paper conducts a systematic study on the key TBM boring technologies under extreme complex geological conditions, and the results show that: (1) the advance geological prediction technology is an important tool for TBM construction to cope with extreme complex geological conditions, but presently, it is not yet possible to accurately quantify and predict the geological conditions in the medium and long distance ahead of the tunnel face.Based on the analysis results of micro-seismic monitoring, corresponding countermeasures may be taken according to potential different rockburst levels such as minor, moderate and intense rockburst levels. For different soft and broken strata such as developed joints, carbonaceous slates, fault and broken zones, etc., targeted measures should be taken to prevent TBM jamming, while a suitable TBM machine release scheme can be chosen according to the length of the poor geological section. (2) Abnormal fluctuations of TBM boring parameters such as thrust, advancing speed, cutterhead rotation speed and torque are important indicators to characterize the geological conditions in front of the tunnel face. Before the TBM excavation, appropriate TBM boring parameters should be selected respectively according to the pre-estimated surrounding rock conditions such as full-face hard rocks or soft and fractured rocks. During the TBM boring process, the predicted geological conditions should be corrected timely, and corresponding control measures should be adjusted based on the abnormal changes of the boring parameters, thus ensuring that the TBM is in the best boring condition. (3) In view of the fact that it is difficult for the existing TBMs to adapt to the existing geological conditions, this paper carries out an analysis and discussion on the TBM modification technologies with the tunnels in the Tao river diversion and water supply project, the Hongyan river-to-shitou river water diversion project and the Hanjiang-to-weihe water diversion project as examples. Finally, it discusses the new problems that could arise in TBM tunnel construction under extreme complex geological conditions and future prospects of corresponding countermeasures.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
FENG Huanhuan1
2 HONG Kairong1
2 YANG Yandong2 YANG Luwei1 SI Jingzhao1 YOU Jinhu3
KeywordsTunnel   TBM construction   Fault   Weak and broken rock   Rockburst   Jamming   TBM modification     
Abstract: With successive construction commencement of the Gaoligongshan Tunnel of the Dali-Ruili Railway, the Qinling Tunnel of the Hanjiang-to-Weihe Water Diversion Project, and the Xianglushan Tunnel of the Central Yunnan Water Diversion Project, various TBM construction problems have become increasingly prominent, such as TBM jamming caused by water-rich, broken and extremely soft strata, and rockburst caused by extremely hard rock strata with high in-situ stress. Firstly, this paper compares and elaborates on the typical adverse geological conditions such as broken and soft rock, and extremely hard granite commonly encountered during the construction of TBM tunnels in China and their impacts on TBM boring. On the basis of summarizing and analyzing the tunnel collapse and TBM jamming cases, and their influencing factors during the construction of various projects such as the Liaoning northwest water supply project, the songhua river water diversion project, and the tao river water supply project, this paper conducts a systematic study on the key TBM boring technologies under extreme complex geological conditions, and the results show that: (1) the advance geological prediction technology is an important tool for TBM construction to cope with extreme complex geological conditions, but presently, it is not yet possible to accurately quantify and predict the geological conditions in the medium and long distance ahead of the tunnel face.Based on the analysis results of micro-seismic monitoring, corresponding countermeasures may be taken according to potential different rockburst levels such as minor, moderate and intense rockburst levels. For different soft and broken strata such as developed joints, carbonaceous slates, fault and broken zones, etc., targeted measures should be taken to prevent TBM jamming, while a suitable TBM machine release scheme can be chosen according to the length of the poor geological section. (2) Abnormal fluctuations of TBM boring parameters such as thrust, advancing speed, cutterhead rotation speed and torque are important indicators to characterize the geological conditions in front of the tunnel face. Before the TBM excavation, appropriate TBM boring parameters should be selected respectively according to the pre-estimated surrounding rock conditions such as full-face hard rocks or soft and fractured rocks. During the TBM boring process, the predicted geological conditions should be corrected timely, and corresponding control measures should be adjusted based on the abnormal changes of the boring parameters, thus ensuring that the TBM is in the best boring condition. (3) In view of the fact that it is difficult for the existing TBMs to adapt to the existing geological conditions, this paper carries out an analysis and discussion on the TBM modification technologies with the tunnels in the Tao river diversion and water supply project, the Hongyan river-to-shitou river water diversion project and the Hanjiang-to-weihe water diversion project as examples. Finally, it discusses the new problems that could arise in TBM tunnel construction under extreme complex geological conditions and future prospects of corresponding countermeasures.
KeywordsTunnel,   TBM construction,   Fault,   Weak and broken rock,   Rockburst,   Jamming,   TBM modification     
Received: 2021-07-10;
Cite this article:   
FENG Huanhuan1, 2 HONG Kairong1, 2 YANG Yandong2 YANG Luwei1 SI Jingzhao1 YOU Jinhu3 .Research and Application of Key Construction Technologies for TBM-driven Tunnels under Extreme Complex Geological Conditions[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(1): 42-54
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I1/42
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[3] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[4] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[5] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[6] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[7] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[8] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
[9] ZHONG Wulin1 HAN Xingbo1 YE Fei1 WANG Han1 CAO Xiaoyong2 XI Weizheng2.Research on Wind Resistance and Optimization Design of Steel Corrugated Plate Support for Tunnel Shafts[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 197-207
[10] JIA Yonggang1 HAO Zihan1 LU Weidong1 WU Fan1 YANG Weiwei2.Mechanical Behavior of Steel Fiber Reinforced Concrete Segments with Different Joint Configurations[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 182-196
[11] TAN Xinyu1 WEI Meng1,2 LAN Lingshen1 SHANG Qiang1 ZHANG Haitao1.Experimental Test and Mechanism Study on Soil Adhesion Reduction Techniques for Mud Cake Formation on Shield Cutterheads[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 219-229
[12] LIU Liying1 WEI Lixin1 YU Zhiyuan2 YANG Xudong3 YE Tingting1.Key Construction Technologies for the Ruyifang Immersed Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 259-272
[13] LIU Pengfei1,2 ZENG Dexing2 WANG Xiao3 YANG Zhao2 LI Yu2.Experimental Evaluation and Application Study on the Shield Muck Cake Decomposition Agents[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 230-237
[14] LUO Long1 ZHU Kaicheng2 HAN Yuxuan3 CAI Dong4 LIU Zheqi5 WANG Jun6.Research on Optimization of Construction Methods for Ultra-large Cross-section Tunnels: A Case Study of the Lihuashan Tunnel on the Tianfu New Area-Qionglai Expressway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 273-282
[15] BA Jin1 TANG Gang2.Mechanical Behaviors and Control Techniques of Karst Tunnel Support Structures in Dolomitic Limestone Strta[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 283-290
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY