Research and Application of Key Construction Technologies for TBM-driven Tunnels under Extreme Complex Geological Conditions
(1. China Railway Tunnel Group Co., Ltd.,Guangzhou 511458 ; 2. State Key Laboratory of Shield Machine and Boring Technology,Zhengzhou 450001; 3. China Railway Tunnel Stock Co., Ltd., Zhengzhou 450001)
Download: PDF (3129KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract With successive construction commencement of the Gaoligongshan Tunnel of the Dali-Ruili Railway, the Qinling Tunnel of the Hanjiang-to-Weihe Water Diversion Project, and the Xianglushan Tunnel of the Central Yunnan Water Diversion Project, various TBM construction problems have become increasingly prominent, such as TBM jamming caused by water-rich, broken and extremely soft strata, and rockburst caused by extremely hard rock strata with high in-situ stress. Firstly, this paper compares and elaborates on the typical adverse geological conditions such as broken and soft rock, and extremely hard granite commonly encountered during the construction of TBM tunnels in China and their impacts on TBM boring. On the basis of summarizing and analyzing the tunnel collapse and TBM jamming cases, and their influencing factors during the construction of various projects such as the Liaoning northwest water supply project, the songhua river water diversion project, and the tao river water supply project, this paper conducts a systematic study on the key TBM boring technologies under extreme complex geological conditions, and the results show that: (1) the advance geological prediction technology is an important tool for TBM construction to cope with extreme complex geological conditions, but presently, it is not yet possible to accurately quantify and predict the geological conditions in the medium and long distance ahead of the tunnel face.Based on the analysis results of micro-seismic monitoring, corresponding countermeasures may be taken according to potential different rockburst levels such as minor, moderate and intense rockburst levels. For different soft and broken strata such as developed joints, carbonaceous slates, fault and broken zones, etc., targeted measures should be taken to prevent TBM jamming, while a suitable TBM machine release scheme can be chosen according to the length of the poor geological section. (2) Abnormal fluctuations of TBM boring parameters such as thrust, advancing speed, cutterhead rotation speed and torque are important indicators to characterize the geological conditions in front of the tunnel face. Before the TBM excavation, appropriate TBM boring parameters should be selected respectively according to the pre-estimated surrounding rock conditions such as full-face hard rocks or soft and fractured rocks. During the TBM boring process, the predicted geological conditions should be corrected timely, and corresponding control measures should be adjusted based on the abnormal changes of the boring parameters, thus ensuring that the TBM is in the best boring condition. (3) In view of the fact that it is difficult for the existing TBMs to adapt to the existing geological conditions, this paper carries out an analysis and discussion on the TBM modification technologies with the tunnels in the Tao river diversion and water supply project, the Hongyan river-to-shitou river water diversion project and the Hanjiang-to-weihe water diversion project as examples. Finally, it discusses the new problems that could arise in TBM tunnel construction under extreme complex geological conditions and future prospects of corresponding countermeasures.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
FENG Huanhuan1
2 HONG Kairong1
2 YANG Yandong2 YANG Luwei1 SI Jingzhao1 YOU Jinhu3
KeywordsTunnel   TBM construction   Fault   Weak and broken rock   Rockburst   Jamming   TBM modification     
Abstract: With successive construction commencement of the Gaoligongshan Tunnel of the Dali-Ruili Railway, the Qinling Tunnel of the Hanjiang-to-Weihe Water Diversion Project, and the Xianglushan Tunnel of the Central Yunnan Water Diversion Project, various TBM construction problems have become increasingly prominent, such as TBM jamming caused by water-rich, broken and extremely soft strata, and rockburst caused by extremely hard rock strata with high in-situ stress. Firstly, this paper compares and elaborates on the typical adverse geological conditions such as broken and soft rock, and extremely hard granite commonly encountered during the construction of TBM tunnels in China and their impacts on TBM boring. On the basis of summarizing and analyzing the tunnel collapse and TBM jamming cases, and their influencing factors during the construction of various projects such as the Liaoning northwest water supply project, the songhua river water diversion project, and the tao river water supply project, this paper conducts a systematic study on the key TBM boring technologies under extreme complex geological conditions, and the results show that: (1) the advance geological prediction technology is an important tool for TBM construction to cope with extreme complex geological conditions, but presently, it is not yet possible to accurately quantify and predict the geological conditions in the medium and long distance ahead of the tunnel face.Based on the analysis results of micro-seismic monitoring, corresponding countermeasures may be taken according to potential different rockburst levels such as minor, moderate and intense rockburst levels. For different soft and broken strata such as developed joints, carbonaceous slates, fault and broken zones, etc., targeted measures should be taken to prevent TBM jamming, while a suitable TBM machine release scheme can be chosen according to the length of the poor geological section. (2) Abnormal fluctuations of TBM boring parameters such as thrust, advancing speed, cutterhead rotation speed and torque are important indicators to characterize the geological conditions in front of the tunnel face. Before the TBM excavation, appropriate TBM boring parameters should be selected respectively according to the pre-estimated surrounding rock conditions such as full-face hard rocks or soft and fractured rocks. During the TBM boring process, the predicted geological conditions should be corrected timely, and corresponding control measures should be adjusted based on the abnormal changes of the boring parameters, thus ensuring that the TBM is in the best boring condition. (3) In view of the fact that it is difficult for the existing TBMs to adapt to the existing geological conditions, this paper carries out an analysis and discussion on the TBM modification technologies with the tunnels in the Tao river diversion and water supply project, the Hongyan river-to-shitou river water diversion project and the Hanjiang-to-weihe water diversion project as examples. Finally, it discusses the new problems that could arise in TBM tunnel construction under extreme complex geological conditions and future prospects of corresponding countermeasures.
KeywordsTunnel,   TBM construction,   Fault,   Weak and broken rock,   Rockburst,   Jamming,   TBM modification     
Received: 2021-07-10;
Cite this article:   
FENG Huanhuan1, 2 HONG Kairong1, 2 YANG Yandong2 YANG Luwei1 SI Jingzhao1 YOU Jinhu3 .Research and Application of Key Construction Technologies for TBM-driven Tunnels under Extreme Complex Geological Conditions[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(1): 42-54
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I1/42
 
No references of article
[1] ZHANG Minqing1 JIA Dapeng1 WANG Shuishan2 GAO Cuncheng3.New Automatic Pouring and Vibrating Techniques for the Construction of Railway Tunnel Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 29-34
[2] CHEN Shaohua.Study on New Structural Type of the Emergency Rescue Station of Mabaishan Tunnel in Qinling Mountains[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 35-41
[3] ZHENG Yingren1 ABI Erdi2.On Stability Analysis and Classification of Surrounding Rocks in Rock Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 1-13
[4] CHEN Xiangsheng1,2 YU Yiliang1,2 BAO Xiaohua1,2 CUI Hongzhi1,2 XIA Changqing1,2.Intelligent Construction of Shield Tunnels Based on Resilience Theory[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 14-28
[5] WANG Shuaishuai1 MAO Jinbo2 ZHANG Binbin2 Li Yalong2 ZHAO Honggang2.General Construction Technology Scheme of Tianshan Shengli Tunnel on Urumqi-Yuli Expressway[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 55-68
[6] ZHANG Chun ZHOU Yuxuan LI Dengpeng.Intelligent Reconstruction of the Digital Model of Metro Shield Tunnels with Disordered Erected Segment Ring Structure[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 80-86
[7] BAO Yifan1,2 WANG Mingnian1,2 QIN Pengcheng1,2 CHEN Zhanwen1,2 HAN Changling3.On Influence of the Shading Shed on the Driver′s Light-dark Adaptation at Tunnel Entrances and Exits[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 111-117
[8] SUN Yi.Analysis on Gas Characteristics of the Sichuan Red-bed Section of ChengduGuiyang Railway and Suggestion on Division of Gas Working Areas in the Survey Stage[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 195-199
[9] MIN Shiping1 PENG Dong2 HE Yuechuan1 ZHANG Tao3.3D Laser Scanning, Measurement and Processing Integrated Technology Solution and Application Practice in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 87-94
[10] JIANG Yajun1 HE Bin1 ZHAO Jumei1 LIU Jitai1 WANG Huqun2,3.Study on Mechanical Properties of Tunnel Lining Structure with Spray-applied Waterproofing Membrane[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 95-103
[11] YANG Juan1,2,3 YANG Qixin2,3 QIU Pinming2,3.Experimental Study on the Bonding Performances of Spray-applied Waterproofing Membrane in Tunnels with CSL Structure[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 104-110
[12] CHEN Guizhou1,2 CHEN Zheng1,2 JU Guoquan3 WANG Huiwu3 GUO Chun1,2.Study on Relationship between Labor Intensity and Oxygen Concentration in High-altitude Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 118-123
[13] WANG Ling1 ZHONG Jiuqiang2,3 ZHU Bitang2,3.Numerical Analysis on Ground Settlement Induced by Shield Tunnelling with Adjacent End Shaft Works[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 124-132
[14] YANG Chunshan1 Wei Lixin1 MO Haihong2.Impact on and Prediction of Segment Opening of Shield Tunnels under Seismic Action[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 133-140
[15] DING Xiaobin HAN Donglin.Analysis of Mechanical Performance of Operational Shield Tunnels under Different Ovality Deformations[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 141-148