Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2023, Vol. 60 Issue (1) :179-185    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Experimental Study on Influence Factors of Rock Breaking with High-pressure Premixed Abrasive Water Jet in Hard Rock Tunnel Boring Machine
(China Railway Engineering Equipment Group Co., Ltd., Zhengzhou 450016)
Download: PDF (3092KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The application of the rock breaking technique with premixed abrasive water jet to the hard rock tunnel boring machine (TBM) is expected to solve the problems of low efficiency and high cost of traditional rock breaking with the disc cutter when high strength rock is tunneled during tunnel construction. However, rock breaking with the premixed abrasive water jet is affected by many factors and the system is complex, and its application in TBM rock breaking and tunnelling field is not mature enough. By making use of the comparative research method and the rockbreaking experimental device with high-pressure water and sand, the comparative tests are performed for fixed sprinkler at fixed time and mobile sprinkler at a constant speed, to study the influence of different hydrostatic pressure, injection distances and moving state of the sprinkler on the average consumption of abrasive, the depth and the width of the rock-breaking pit. For the rock-breaking width, these factors are sorted by their influence: moving state, injection distance and hydrostatic pressure. For the depth of rock breaking, these factors are sorted by their influence:movingstate,hydrostatic pressure and injection distance. By exploring the best rock breaking parameters of the premixed abrasive water jet technique, a basis is provided for the research of TBM-based new rock breaking techniques.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WEN Yongliang YANG Xingya HE Fei WANG Heng LU Yiqiang
KeywordsPremixed abrasive water jet   TBM   Rock breaking   Average abrasive consumption   Depth and width of rock breaking pit   Comparative     
Abstract: The application of the rock breaking technique with premixed abrasive water jet to the hard rock tunnel boring machine (TBM) is expected to solve the problems of low efficiency and high cost of traditional rock breaking with the disc cutter when high strength rock is tunneled during tunnel construction. However, rock breaking with the premixed abrasive water jet is affected by many factors and the system is complex, and its application in TBM rock breaking and tunnelling field is not mature enough. By making use of the comparative research method and the rockbreaking experimental device with high-pressure water and sand, the comparative tests are performed for fixed sprinkler at fixed time and mobile sprinkler at a constant speed, to study the influence of different hydrostatic pressure, injection distances and moving state of the sprinkler on the average consumption of abrasive, the depth and the width of the rock-breaking pit. For the rock-breaking width, these factors are sorted by their influence: moving state, injection distance and hydrostatic pressure. For the depth of rock breaking, these factors are sorted by their influence:movingstate,hydrostatic pressure and injection distance. By exploring the best rock breaking parameters of the premixed abrasive water jet technique, a basis is provided for the research of TBM-based new rock breaking techniques.
KeywordsPremixed abrasive water jet,   TBM,   Rock breaking,   Average abrasive consumption,   Depth and width of rock breaking pit,   Comparative     
Cite this article:   
WEN Yongliang YANG Xingya HE Fei WANG Heng LU Yiqiang .Experimental Study on Influence Factors of Rock Breaking with High-pressure Premixed Abrasive Water Jet in Hard Rock Tunnel Boring Machine[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(1): 179-185
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I1/179
 
No references of article
[1] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[2] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[3] GENG Qi XIE Weifeng YANG Mulin WANG Xuebin HUANG Yufeng LI Lei LI Xiaobin LI Zhibiao.Development of a Scaled Multifunctional TBM Rock-breaking Test Platform[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 208-218
[4] WANG Lichuan1,2 YAN Guangtian1 YUAN Wei GAO Hongbing4 LI Liping2 ZHANG Chunyu1,5 WU Jian4 ZHANG Long3.Development and Application of TBM-mounted Omni-directional and Normal Deep Anchor Hole Drilling Machine[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 67-74
[5] ZHU Junlin1 ZHENG Mingming1, 2 PENG Linzhi ZHU Chengtao1 XIONG Liang1 ZHANG Yawei WU Zurui.Dynamic Response of Composite Support Structures Under Different Blasting Methods for TBM Breakout[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 117-125
[6] LI Jiuyuan1 GAO Fayong1 MA Yongtao1 TANG Mingyang2 FU Kang3 LI Yuheng2 XUE Yiguo2.Study on Surrounding Rock Identification and Excavation Speed Prediction in TBM Tunnels Based on the Interaction Mechanism of Rock-Machine Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 75-87
[7] JIA Lianhui1 ZHENG Wentao2 LU Yiqiang1 HE Fei1 SHANGGUAN Linjian2 ZHANG Yuxiang1.Force Analysis and Numerical Calculation Platform for Anti Back-sliding Device of TBM in Inclined Shafts[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 79-86
[8] ZHANG Guang1 GONG Qiuming1 XIE Xingfei1 PEI Chengyuan2 SHANG Ceng2.Interval Prediction of TBM Parameters in Stable Excavation Sections Based on Bootstrap-COA-BiGRU Model[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 121-131
[9] DONG Weijie1 ZHANG Siyang1 LI Bochang2 JIANG Yao1 CHEN Xu1 ZHENG Xiangle2 CHEN Sipan2 WU Di1.Study on TBM Jamming Problems in Jurassic and Cretaceous Argillaceous Sandstone Strata in Northern Xinjiang[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 151-161
[10] LIU Shaoqiang1 XU Jianshu2 YANG Xiu2 TANG Qisheng1 XIE Xingfei1 GONG Qiuming1 ZHOU Xiaoxiong3.TBM Cutter Edge Tip Wear Phenomenon and Wear Evolution Characteristics[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 20-27
[11] GENG Qi1 HUANG Dengxia2 CHEN Jianxun3 LIU Weiwei3 LUO Yanbin3 MA Maoxun1 LI Xiaobin1.Study on Cutting Performance of New Wedge-flat Combined TBM Cutters in Extreme Hard Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 114-124
[12] HUANG Dengxia1 LUO Yanbin2 ZHAO Zhiqiang2 CHEN Jianxun2 LIU Weiwei2 FENG Rubing1 WU Teligen1.Measurement and Analysis of Dust Concentration in Service Tunnel during Construction of Tianshan Shengli Tunnel with "TBM Method + Drill and Blast Method"[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 77-85
[13] ZHANG Yan HUO Tao ZHANG Zhongwei MA Chunming.TBM Muck Segmentation Method Based on Global Perception and Edge Refinement[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 141-147
[14] LI Jianbin.Advances and Prospects of Tunnel Boring Machine Technology in China[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 178-189
[15] LI Zongping1 WANG Shuaishuai2,4 MAO Jinbo3 LI Yalong3 NIU Xiaoyu2,4.Key Technological Innovation and Application in the Construction of Tianshan Shengli Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 241-253
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY