Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2023, Vol. 60 Issue (1) :179-185    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Experimental Study on Influence Factors of Rock Breaking with High-pressure Premixed Abrasive Water Jet in Hard Rock Tunnel Boring Machine
(China Railway Engineering Equipment Group Co., Ltd., Zhengzhou 450016)
Download: PDF (3092KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The application of the rock breaking technique with premixed abrasive water jet to the hard rock tunnel boring machine (TBM) is expected to solve the problems of low efficiency and high cost of traditional rock breaking with the disc cutter when high strength rock is tunneled during tunnel construction. However, rock breaking with the premixed abrasive water jet is affected by many factors and the system is complex, and its application in TBM rock breaking and tunnelling field is not mature enough. By making use of the comparative research method and the rockbreaking experimental device with high-pressure water and sand, the comparative tests are performed for fixed sprinkler at fixed time and mobile sprinkler at a constant speed, to study the influence of different hydrostatic pressure, injection distances and moving state of the sprinkler on the average consumption of abrasive, the depth and the width of the rock-breaking pit. For the rock-breaking width, these factors are sorted by their influence: moving state, injection distance and hydrostatic pressure. For the depth of rock breaking, these factors are sorted by their influence:movingstate,hydrostatic pressure and injection distance. By exploring the best rock breaking parameters of the premixed abrasive water jet technique, a basis is provided for the research of TBM-based new rock breaking techniques.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WEN Yongliang YANG Xingya HE Fei WANG Heng LU Yiqiang
KeywordsPremixed abrasive water jet   TBM   Rock breaking   Average abrasive consumption   Depth and width of rock breaking pit   Comparative     
Abstract: The application of the rock breaking technique with premixed abrasive water jet to the hard rock tunnel boring machine (TBM) is expected to solve the problems of low efficiency and high cost of traditional rock breaking with the disc cutter when high strength rock is tunneled during tunnel construction. However, rock breaking with the premixed abrasive water jet is affected by many factors and the system is complex, and its application in TBM rock breaking and tunnelling field is not mature enough. By making use of the comparative research method and the rockbreaking experimental device with high-pressure water and sand, the comparative tests are performed for fixed sprinkler at fixed time and mobile sprinkler at a constant speed, to study the influence of different hydrostatic pressure, injection distances and moving state of the sprinkler on the average consumption of abrasive, the depth and the width of the rock-breaking pit. For the rock-breaking width, these factors are sorted by their influence: moving state, injection distance and hydrostatic pressure. For the depth of rock breaking, these factors are sorted by their influence:movingstate,hydrostatic pressure and injection distance. By exploring the best rock breaking parameters of the premixed abrasive water jet technique, a basis is provided for the research of TBM-based new rock breaking techniques.
KeywordsPremixed abrasive water jet,   TBM,   Rock breaking,   Average abrasive consumption,   Depth and width of rock breaking pit,   Comparative     
Cite this article:   
WEN Yongliang YANG Xingya HE Fei WANG Heng LU Yiqiang .Experimental Study on Influence Factors of Rock Breaking with High-pressure Premixed Abrasive Water Jet in Hard Rock Tunnel Boring Machine[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(1): 179-185
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I1/179
 
No references of article
[1] NING Xiangke1 GENG Qi2 LU Zhiyong2 YU Qingzeng1.A Study on the Rock-breaking Mechanism of Disc Cutters on Cone Cutterhead of Full-face Tunnel Boring Machines[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 73-83
[2] DU Hongjin1 XIONG Hao2,3 ZHOU Hao1 ZENG Deqi4.Numerical Reconstruction of TBM Muck with Real Shape and Numerical Simulation of Muck Transfer Process[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 34-40
[3] ZHANG Qinglong1,2 ZHU Yanwen1 MA Rui2 YAN Dong3 YANG Chuangen3 CUI Tonghuan3 LI Qingbin2.Study on Prediction of TBM Tunnelling Parameters Based on Attentionenhanced Bi-LSTM Model[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 69-80
[4] HOU Kunzhou.Study on TBM Deviation Correction and Direction Control Based on the Deep Transfer Learning (DTL)[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 81-89
[5] HU Mengling YE Jiatong DAI Jun YANG Fan.Study on the Pattern of Hard Rock Damage and Constitutive Relation with the Microwave-Force Action[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 40-49
[6] CHEN Fan1 HE Chuan1 HUANG Zhonghui2 MENG Qingjun2 LIU Chuankun1 WANG Shimin1.Study on the Adaptability and Selection of Multi-mode Tunnelling Equipment for Subway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 53-62
[7] Wang Shuangjing1,2 Wang Yujie1 Li Xu3 Liu Lipeng1 Yin Tao1,2.Study of Standardized Pre-processing Method of TBM Tunnelling Data[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 38-44
[8] FENG Huanhuan1,2 HONG Kairong1,2 YANG Yandong2 YANG Luwei1 SI Jingzhao1 YOU Jinhu3.Research and Application of Key Construction Technologies for TBM-driven Tunnels under Extreme Complex Geological Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 42-54
[9] WANG Shuaishuai1 MAO Jinbo2 ZHANG Binbin2 Li Yalong2 ZHAO Honggang2.General Construction Technology Scheme of Tianshan Shengli Tunnel on Urumqi-Yuli Expressway[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 55-68
[10] ZHANG Jinliang1 HUANG Qiuxiang2 WANG Xueying1 HU Chao2 ZHANG Shaoxuan2.Study on Engineering Influence of Defects in Pea Gravel Backfilling and Grouting Layer[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 163-172
[11] GAO Xin WANG Wenjuan LI Qingfei FENG Shijie WU Qi.Research on the Routing Scheme of a Double Shield TBM Passing through the Metro Station[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 56-64
[12] YANG Jihua1 GUO Weixin1 YAN Changbin2 MIAO Dong1.Study on Optimization of TBM Driving Parameters Based on the Energy Consumption[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 54-60
[13] XU Peng1 HUANG Jun1 ZHOU Jianbo1 TANG Jinzhou2.3D Numerical Simulation of the Interaction between Rock Mass and Shield TBM Passing through the Fault Fracture Zone[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 63-69
[14] LI Gang1 LI Xiaojun1 YANG Wenxiang2 HAN Dong1.Research on Prediction of TBM Driving Parameters Based on Deep Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 154-159
[15] WANG Yanqing ZENG Nianchang LIU Bolong.Analysis on Infrared Radiation Temperature Characteristics of Jointed Rock Masses with Different Orientations under Action of Disc Cutters[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 193-199
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY