Construction Scheme and Application Analysis of Synchronous Construction of Subway Shield Tunnels and Freezing Reinforcement for Cross Passages
(Beijing Uni.-Construction Group Co., Ltd.,Beijing 100000)
Download: PDF (7859KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Taking the east extension project of Beijing Metro Line 7 as a project case, in order to ensure the sched? ule of the opening and operation of the line, the mechanical and electrical installation and decoration of stations,construction of shield tunnels and freezing for cross passages had to be carried out simultaneously. Based on this,during construction, the construction schedule, site conditions (ground surface and interior of stations and tunnels),freezing effect and cost were comprehensively considered, the construction technical scheme that two cross passages share one freezing station was proposed, that is, the freezing station was located in the middle of two cross passages of the tunnel that has achieved breakthrough. By means of optimizing the selection of freezing station units, layout of freezing pipeline, tunnel segment pre-reinforcement support system and other technical measures, synchronous construction of shield tunnels and freezing reinforcement was achieved. According to monitoring and data analysis of the construction process, the development law of the freezing wall and the conditions for the safe excavation of the passages were summarized, and countermeasures for the problems were proposed, such as rise of the cooling water temperature on the site and the ambient temperature. The results show that the construction scheme and relevant technical measures are safe, effective and feasible.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
CHEN Jingang GUO Qiang ZHOU Hailong HUAI Wenbao DONG Xiaoqi
KeywordsSubway tunnels   Shield tunnelling   Cross passages   Freezing method   Scheme optimization   Monitoring and analysis     
Abstract: Taking the east extension project of Beijing Metro Line 7 as a project case, in order to ensure the sched? ule of the opening and operation of the line, the mechanical and electrical installation and decoration of stations,construction of shield tunnels and freezing for cross passages had to be carried out simultaneously. Based on this,during construction, the construction schedule, site conditions (ground surface and interior of stations and tunnels),freezing effect and cost were comprehensively considered, the construction technical scheme that two cross passages share one freezing station was proposed, that is, the freezing station was located in the middle of two cross passages of the tunnel that has achieved breakthrough. By means of optimizing the selection of freezing station units, layout of freezing pipeline, tunnel segment pre-reinforcement support system and other technical measures, synchronous construction of shield tunnels and freezing reinforcement was achieved. According to monitoring and data analysis of the construction process, the development law of the freezing wall and the conditions for the safe excavation of the passages were summarized, and countermeasures for the problems were proposed, such as rise of the cooling water temperature on the site and the ambient temperature. The results show that the construction scheme and relevant technical measures are safe, effective and feasible.
KeywordsSubway tunnels,   Shield tunnelling,   Cross passages,   Freezing method,   Scheme optimization,   Monitoring and analysis     
Cite this article:   
CHEN Jingang GUO Qiang ZHOU Hailong HUAI Wenbao DONG Xiaoqi .Construction Scheme and Application Analysis of Synchronous Construction of Subway Shield Tunnels and Freezing Reinforcement for Cross Passages[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(1): 233-240
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I1/233
 
No references of article
[1] SU Dong1,2,3 TAN Yijun1 SHEN Xiang1,2,3 HUANG Changfu4 CHEN Xiangsheng1,2,3.A Study on Impact of Soft Soil Stratum Reinforcement on the Attitude Regulation of Shield Machine and Stratum Deformation[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 138-148
[2] WEI Lifeng1 TIAN Yang1 ZHU Muyuan1 ZOU Kunmi2 FANG Yong1.Study on the Deformation Control of Non-barrier Launching of Large Diameter Double-mode Shields at Shallow Depth[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 149-158
[3] YUAN Jie1 QI Jiarui2 XIAO Xiang1 LI Zanxin1 YU Lixin1 PAN Yiheng2.An Experimental Study on the Active Regulation of Filling Pressure in Shield Receiving Steel Sleeve[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 230-237
[4] DU Yongxiao1,2,3 SUN Xiaoli1,2,4 YANG Jun1,2,4 ZHANG Yansen1,2.A Study on the Detection and Evaluation of the Technical Condition of Fire Damage in Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 260-270
[5] CHEN Jingxu CAI Yongchang.Research on Virtual Joint Test Method of Shield Tunnels Based on Independent Cover Isogeometric Shell Model[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 22-27
[6] LIU Tingyu1,2 WANG Shuying1,2,3 ZHONG Jiazheng1,2.A Review of Experimental and Theoretical Studies on the Slump of Conditioned Spoils of Earth Pressure Balance Shields[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 1-13
[7] ZHENG Shuang1,2 LIU Chao3 ZHU Delin3 LIU Hai3 JIA Xinjuan1.A Study on Disturbance Pattern of Asymmetric Synchronous Grouting on Ground during Large Diameter Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 168-177
[8] ZHANG Jianyong1 LI Mingyu2,3 CHEN Jian3,4 YU Liucheng2 LI Yixiang1 YANG Gongbiao3,4 WANG Yue2,3.Prediction Methods for Segment Uplift in Large-diameter Shield Tunnels Based on Double Elastic Foundation Beams[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 159-167
[9] WU Ze1 GU Fulin2 FU Yanbin3.Quantitative Deviation Correction Technologies for Subway Shield Tunnels in Operation through Compaction Grouting[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 185-193
[10] CUI Guangyao1 MA Jianfei2 NING Maoquan3,4 TANG Zaixing3,4 LIU Shunshui3,4 TIAN Yuhang1.A Study on Optimization of Reinforcement Scheme for Adjacent Construction of Super-large Rectangular Pipe Jacking Shield Tunnel in Soft Ground[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 178-184
[11] WANG Yesheng1,2 WU Yong1,2 ZHAO Liangyun3 LI Wei3 JIANG Yijie4 ZHAO Huan4 DING Zhi5,6.Research & Development and Application Analysis of Risk Ranking Management and Control Platform for Shield Construction of Urban Underground Works[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 76-89
[12] CAO Xiangpeng1,2 FENG Kun2 XUE Haoyun2 MAO Sheng1 YU Bo2,3.Study on Transverse Seismic Performance of Double Lining of Large Diameter Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 130-139
[13] CAO Yazhou1 WU Zhixiong1 LI Yannan1 HU Liming1 WANG Rui1 ZHANG Xuan2 XIAO Ying2.Experimental Study on the Adsorption Law of Anionic Surfactants in Shield Soil[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 195-201
[14] HU Min1,2 HU Xingchen1,2 SONG Yun3 QIANG Pei3.Design and Development of the Shield Construction Assistant Decision-making System Based on the Knowledge Graph[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 66-75
[15] CHEN Fujiang1 DUAN Rongqian1 ZHANG Xin2 LIU Jingang3 SUN Cangqian1 LI Xiqian1.Analysis on Vibration Influence of the Construction of Short-distance Pile Foundation on Existing Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 140-148
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY