Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2023, Vol. 60 Issue (3) :81-89    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Differences in Mechanical Responses of Granite and Limestone when Cut by TBM Disc Cutters
(1. China Railway 18th Bureau Group Co., Ltd., Tianjin 300222; 2. School of Civil Engineering, Southwest Jiaotong University,Chengdu 610031; 3. National Engineering Laboratory for Highway Maintenance Equipment, Chang′an University, Xi′an 710061;4. School of Civil Engineering, Dalian University of Technology, Dalian 116024; 5. China Railway 18th Bureau Group Municipal Engineering Co., Ltd., Tianjin 300350; 6. Wuhan Metro Group Co., Ltd., Wuhan 430040)
Download: PDF (5813KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In order to reveal the differences in mechanical responses of granite and limestone when penetrated by TBM, the double disc cutters rock breaking mechanism and the influencing factors have been investigated by using the methods including measurement of mechanical parameters of standard rock specimen, ABAQUS-SPH numerical simulation and field measurement. As the results suggest, the ABAQUS-SPH numerical simulation method is effective in simulating rock deformation and failure state during rock breaking by disc cutters; the torque of the disc cutter is sensitive to the cutting sequence, while the disc cutter thrust is sensitive to the rock strength. When rock strength increases, the disc cutter needs much more thrust to cut to the same level. Under the calculated parameters in this study, the rock breaking efficiency of the disc cutter when penetrating limestone stratum is higher than the efficiency when penetrating granite stratum, and the rock ridge width between cutters is in direct proportion to rock strength.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WANG Lichuan1
2 FU Boyi2 ZHANG Huijian2 JI Guodong1 GENG Qi3 WANG Zhengzheng4
KeywordsTBM disc cutter   Numerical simulation   Thrust   Torque   Granite   Limestone     
Abstract: In order to reveal the differences in mechanical responses of granite and limestone when penetrated by TBM, the double disc cutters rock breaking mechanism and the influencing factors have been investigated by using the methods including measurement of mechanical parameters of standard rock specimen, ABAQUS-SPH numerical simulation and field measurement. As the results suggest, the ABAQUS-SPH numerical simulation method is effective in simulating rock deformation and failure state during rock breaking by disc cutters; the torque of the disc cutter is sensitive to the cutting sequence, while the disc cutter thrust is sensitive to the rock strength. When rock strength increases, the disc cutter needs much more thrust to cut to the same level. Under the calculated parameters in this study, the rock breaking efficiency of the disc cutter when penetrating limestone stratum is higher than the efficiency when penetrating granite stratum, and the rock ridge width between cutters is in direct proportion to rock strength.
KeywordsTBM disc cutter,   Numerical simulation,   Thrust,   Torque,   Granite,   Limestone     
Cite this article:   
WANG Lichuan1, 2 FU Boyi2 ZHANG Huijian2 JI Guodong1 GENG Qi3 WANG Zhengzheng4 .Differences in Mechanical Responses of Granite and Limestone when Cut by TBM Disc Cutters[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(3): 81-89
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I3/81
 
No references of article
[1] HU Zhenyu1 FENG Kun1 GUO Wenqi1 PENG Changsheng2 LI Jiaoyang2.Study on the Impact of Different Construction Timings of Internal Structure on the Stress of Segmental Lining of the Shield Tunnel with an Super-large Section[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 90-101
[2] ZHANG Xuejun1 NIE Qiqiang2 GONG Yuanjiang3.Study on Large Deformation Law of Soft Rock Tunnel in Red Bed in Central Yunnan[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 156-163
[3] YAN Bo1 ZHANG Junru2 ZHANG Xinjin1 PENG Lei1 Ning Bo1.A Study on the Stability of Surrounding Rocks in Construction of Undercrossing Tunnels with Super-large Section Based on Radial Displacement Release Rate of Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 115-124
[4] YANG Yanchun.Research on the Initial In-situ Stress Inversion Method Based on Disturbance Correction of Tunnel Excavation and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 100-106
[5] XU Hong1 YE Fei2 LIU Qi1 TIAN Liming1 AN Huan1.Study on Stratum Deformation Caused by Large-section Rectangular Pipe Jacking and Jacking Parameter Control[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 97-105
[6] SONG Zhanping1,2,3 PEI Jiafeng1,3 PAN Hongwei2,4 SUN Ze1,3 DING Libo5.Analysis on the Support Effect of Advance Large Pipe Umbrella at Portal Section of Shallow Tunnel under Unsymmetrical Load[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 86-96
[7] PEI Luguang1 FU Helin2 YU Nenggen1 YU Gui2 HOU Weizhi1.Research on Airport Tubing Settlement Caused by Shield Tunnelling in Curved Section[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 27-33
[8] WANG Wei1,2 LI Xianmin1 SUN Xinhai1,2.Numerical Simulation Study on the Supporting Effect of Bolts in Interbedded Soft Rock Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 99-107
[9] LEI Zhongdai1,2 KONG Xinli3 WANG Wenye3 YAN Zhiguo1,2.Numerical Simulation Study on Loosened Zone of Surrounding Rock of Large-span Flat Caverns[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 41-46
[10] ZHAO Sensen ZHANG Dongmei HUANG Zhongkai.Mechanical Characteristics of Distributed Mortise-and-Tenon of Largediameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 54-62
[11] LU Xiaogang1 GENG Jianyu1 PANG Lei1 FAN Jinhai1 LI Liangyong1 FANG Yabiao2,3 WANG Feng2,3.Analysis of Construction Mechanical Behavior and Parameter Optimization for Subsequent Tunnel Tube of Double-arch Tunnel without Middle Drift[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 80-90
[12] ZHU Yeting1,2 GONG Wei1,2 QIN Yuan1,2 YUAN Xianghua1,2 WU Wenfei1,2 ZHANG Boya1,2 ZHU Yanfei1.Closed-loop Control Technology of Shield Thrust Hydro-cylinder Pressure Based on Target Total Thrust Vector[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 170-178
[13] LIU Zhaowei.Research on the Technology for the Shield Tunnel Crossing the Railway Marshalling Station in the Pebble-boulder Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 226-233
[14] YU Jianyou1 JIANG Yifan2 LIN Ming2 LIU Jianqi1 CAI Libin2 JIANG Xinzheng2 WANG Zhijie2 ZHOU Ping2.Thickness Calculation Method for the Insulation Layer of the Tunnel in Cold Region Considering Seepage and Fissures[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 108-117
[15] LI Weilin1 ZHANG Guang1 ZHU Yingwei1 HU Shaohua1,2.A 3D Numerical Simulation Study on the Ventilation of T-Shaped Tunnels with Different Bifurcation Angles during Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 158-166
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY