Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2023, Vol. 60 Issue (6) :255-261    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on Backfill Grouting Behind the Segment of Double Shield TBM Metro Tunnel Crossing Water-bearing Fault Zone
(1. Qingdao Metro Line 6 Co., Ltd., Qingdao 266427; 2. Qingdao Metro Group Co., Ltd., Qingdao 266045; 3. School of Mechanics and Civil Engineering, China University of Mining and Technology-Beijing, Beijing 100083;4. China Railway No.2 Engineering Group Co., Ltd., Chengdu 610031)
Download: PDF (3320KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract For tunnelling through a stratum in water-bearing fault zone by double shield TBM in urban metro construction, the problems such as water inflow and poor self-stability of surrounding rock are very likely to occur.Grouting in the gap between the segment wall and surrounding rock will prevent water inflow, and also reinforce and support the surrounding rock in a timely manner. On this basis, the TBM shield tail blocking plate structure is designed, and a new construction process is devised that allows pea gravel backfilling and synchronous grouting. First,the optimum mix ratio of synchronous grouting slurry is determined through laboratory test. Then based on the positions of the preformed holes of segment and the volume of gap between surrounding rock and segment, the construction process of "three-step pea gravel backfilling" and "three-step grouting" is devised. At last, the process is put to field application. The results indicate: the optimum solution A mix ratio of synchronous grouting slurry is fly ash∶cement∶ water=2.5∶1∶2, the concretion rate is up to 95%, and the double-solution grout with solution A∶solution B=1∶1 has the shortest initial setting time and strongest resistance against water dilution. When this process is applied in practical work, pea gravel backfilling creates solid mass, the backfilled structure is intact, the formed tunnel structure is stable, segment settlement is effectively controlled, and there is no water leakage.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LIU Quanwei1
2 YANG Xing3 YE Shoujie1
2 JIANG Yusheng3 ZHAO Jizeng1
2 TAN Zhuolin4 YANG Zhiyong3
KeywordsWater-bearing stratum   Fault zone   Double shield TBM   Segment   pea gravel   Synchronous grouting     
Abstract: For tunnelling through a stratum in water-bearing fault zone by double shield TBM in urban metro construction, the problems such as water inflow and poor self-stability of surrounding rock are very likely to occur.Grouting in the gap between the segment wall and surrounding rock will prevent water inflow, and also reinforce and support the surrounding rock in a timely manner. On this basis, the TBM shield tail blocking plate structure is designed, and a new construction process is devised that allows pea gravel backfilling and synchronous grouting. First,the optimum mix ratio of synchronous grouting slurry is determined through laboratory test. Then based on the positions of the preformed holes of segment and the volume of gap between surrounding rock and segment, the construction process of "three-step pea gravel backfilling" and "three-step grouting" is devised. At last, the process is put to field application. The results indicate: the optimum solution A mix ratio of synchronous grouting slurry is fly ash∶cement∶ water=2.5∶1∶2, the concretion rate is up to 95%, and the double-solution grout with solution A∶solution B=1∶1 has the shortest initial setting time and strongest resistance against water dilution. When this process is applied in practical work, pea gravel backfilling creates solid mass, the backfilled structure is intact, the formed tunnel structure is stable, segment settlement is effectively controlled, and there is no water leakage.
KeywordsWater-bearing stratum,   Fault zone,   Double shield TBM,   Segment,   pea gravel,   Synchronous grouting     
Cite this article:   
LIU Quanwei1, 2 YANG Xing3 YE Shoujie1, 2 JIANG Yusheng3 ZHAO Jizeng1 etc .Study on Backfill Grouting Behind the Segment of Double Shield TBM Metro Tunnel Crossing Water-bearing Fault Zone[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(6): 255-261
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I6/255
 
No references of article
[1] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[2] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
[3] JIA Yonggang1 HAO Zihan1 LU Weidong1 WU Fan1 YANG Weiwei2.Mechanical Behavior of Steel Fiber Reinforced Concrete Segments with Different Joint Configurations[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 182-196
[4] ZHU Junlin1 ZHENG Mingming1, 2 PENG Linzhi ZHU Chengtao1 XIONG Liang1 ZHANG Yawei WU Zurui.Dynamic Response of Composite Support Structures Under Different Blasting Methods for TBM Breakout[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 117-125
[5] ZHANG Hang1 TIAN Quan1 CHEN Liangqing1 HUANG Minyao2 LING Chengpeng2.Experimental Study on Self-potential Response during Water Inrush Processes in Tunnels Crossing Fault Zones[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 201-208
[6] ZHU Shuangting1 REN Guoping2 ZHAO Qiang3 GAO Xin2 ZHANG Jian2 ZHENG Bin2 WANG Haibo2.Research on Shield Grouting Materials Based on Resource Utilization of Granite Rock Powder[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 270-281
[7] CHEN Weijie1 FU Zeng2 ZHU Taifeng1 YU Changyi2 SU Dong1,3 WANG Quansheng2.Numerical Simulation Study on the Load Bearing Performance of Segment-steel-concrete Composite Beams under Prestress[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 162-171
[8] BAI Zhongkun1,2 WANG Yawei1,2 BI Chengcheng1,2 ZHAO Xiuwang1,2 ZHU Qiang3.Design and Experimental Research on Segment Sealing Gasket of Vertical Shaft Using Upward Pipe Jacking Technology[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 221-229
[9] YAO Zhanhu1 YANG Qin2 LI Hui2 WEI Daiwei2 MENG Jia2.Study and Application of Dual-component Synchronous Grouting Technology in Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 265-273
[10] MU Haixing1 FENG Kun1 GUO Wenqi1 YANG Shaoyi1 ZHANG Liangliang2.Study on the Mechanical Behavior and Failure Characteristics of Ultra-large Diameter Shield Tunnel Segment Structures[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 125-134
[11] WAN Dongxing1 ZHANG Di2 SUN Feng2 PAN Chenxin3 ZHU Zhenwei1 XU Xiaofeng1 HE Chao1 SHEN Tuqi1.Study on the Mechanical Response of Tunnel Segment Structures in Ultra-large Diameter Shallow-buried Shield Tunnels during Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 135-146
[12] JIA Lianhui1 YAN Yangyi1 XUE Guangji1 DONG Yanping1 GONG Tingmin1 SHEN Chao2.Design and Construction Technology of U-shaped Shield Pipe Erecting Machine for Green Prefabricated Integrated Utility Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 275-284
[13] QIU Wei1 ZENG Qingcheng1 OUYANG Jian1 MU Haixing2 GUO Wenqi2 FENG Kun2 HU Dawei3.Study on Shear Mechanical Performances of Circumferential Mortise and Tenon Joints with Oblique Bolts in Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 129-138
[14] WEI Gang1,2 XU Tianbao3 FENG Feifan4 MU Zhiyuan3 ZHANG Zhiguo5.Study on the Deterioration Mechanism of Subway Shield Tunnel Structure Based on the Full-scale Test[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 182-190
[15] LIU Sijin1 SHI Linken1 WEI Yingjie1 WANG Huawei1 DU Jikai2 WANG Jun1 YU Yunxiang1 ZHU Lin3.Study on Thrust Vector Control Method for Shield Synchronous Propulsion and Assembly Based on Thrust Uniformity[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 10-20
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY