Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2025, Vol. 62 Issue (5) :109-    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Intelligent Recognition and Quantification of Rock Fragmentation #br# at the Tunnel Face Using UAV-based Methods for Roadheader Excavation
(1. Key Laboratory of Geotechnical and Underground Engineering of Education Ministry, Tongji University, Shanghai 200092;
2. Department of Geotechnical Engineering College of Civil Engineering, Tongji University, Shanghai 200092;
3. Kunming Survey, Design and Research Institute Co., Ltd. of CREEC, Kunming 650200;
4. China Railway Kunming Group Co., Ltd, Kunming 650011)
Download: PDF (4337KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract To mitigate the interference of construction dust on tunnel face observation during roadheader excavation and eliminate the subjectivity associated with manual rock mass assessment, an intelligent recognition method is proposed for quantifying rock fragmentation at the tunnel face by integrating unmanned aerial vehicle (UAV) autonomous inspection with computer vision techniques. First, the Fast-Planner algorithm is employed to achieve UAV autonomous obstacle avoidance and path planning, enabling continuous acquisition of 412 high-resolution RGB images from 100 excavation cycles at a high-speed railway tunnel construction site in Yunnan Province. Then, a U-Net++ network is used for feature extraction, and kernel density estimation is applied to fit the probability distribution of the fragmentation ratio k, showing that the main density peak is located near 0.11. Finally, a cuttability evaluation table for roadheader excavation is developed based on the value of k. The results show that the proposed method achieves an 83.2% accuracy in extracting rock mass features, significantly outperforming traditional manual assessment and providing a feasible solution for safe, efficient, and intelligent tunnel construction evaluation.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
HUNAG Feipeng1
2 GUO Yongfa3 DING Wenyun3 SHI Yu4 XUE Yadong1
2 ZHENG Zhaohui1
2
KeywordsRoadheader   Unmanned aerial vehicle (UAV)   Computer vision   U-Net++   Kernel density estimation     
Abstract: To mitigate the interference of construction dust on tunnel face observation during roadheader excavation and eliminate the subjectivity associated with manual rock mass assessment, an intelligent recognition method is proposed for quantifying rock fragmentation at the tunnel face by integrating unmanned aerial vehicle (UAV) autonomous inspection with computer vision techniques. First, the Fast-Planner algorithm is employed to achieve UAV autonomous obstacle avoidance and path planning, enabling continuous acquisition of 412 high-resolution RGB images from 100 excavation cycles at a high-speed railway tunnel construction site in Yunnan Province. Then, a U-Net++ network is used for feature extraction, and kernel density estimation is applied to fit the probability distribution of the fragmentation ratio k, showing that the main density peak is located near 0.11. Finally, a cuttability evaluation table for roadheader excavation is developed based on the value of k. The results show that the proposed method achieves an 83.2% accuracy in extracting rock mass features, significantly outperforming traditional manual assessment and providing a feasible solution for safe, efficient, and intelligent tunnel construction evaluation.
KeywordsRoadheader,   Unmanned aerial vehicle (UAV),   Computer vision,   U-Net++,   Kernel density estimation     
Cite this article:   
HUNAG Feipeng1, 2 GUO Yongfa3 DING Wenyun3 SHI Yu4 XUE Yadong1, 2 ZHENG Zhaohui1 etc .Intelligent Recognition and Quantification of Rock Fragmentation #br# at the Tunnel Face Using UAV-based Methods for Roadheader Excavation[J]  MODERN TUNNELLING TECHNOLOGY, 2025,V62(5): 109-
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2025/V62/I5/109
 
No references of article
[1] WANG Jie1,2 DING Wenyun3 LUO Wei1,2 YANG Jinjing3 ZHANG Jinrong4 XUE Yadong1,2 .Multi-objective Intelligent Optimization Framework for Construction Procedures of Large Cross-section Karst Tunnels Excavated Beneath Airports Using Roadheaders[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(5): 97-
[2] XU Jianfeng1 ZHANG Xiangchuan1 QIN Guifang1 KUANG Huajiang1 LIU Guanghui1 DENG Xingxing1.Intelligent Identification Method of Surrounding Rock Grades of Tunnel Face Based on Drilling Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 79-87
[3] WANG Yuanye1 DING Wenqi1,2 YANG Jinjing3 QIAO Yafei1,2 DING Wenyun3.Study on the Disturbance Patterns of Roadheader Construction of Large-section Railway Tunnel Under-crossing Existing Buildings in Karst Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 274-284
[4] LIU Wanlin1 SHANG Mingming2 WANG Quansheng2 WANG Donghong2 WEN Shiyu1.Comparison and Selection of Construction Schemes for the Boom-type Roadheader in Small-section Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 266-273
[5] LUO Hu1 Miller Mark1 ZHANG Rui2 FANG Yong1.Research on the Automatic Identification Method for Rock Mass Fracture in Tunnel Face Based on Computer Vision Technology and Deep Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 56-65
[6] HUANG Jifu XIAO Gongyi.Study on Practical Application and Adaptability of the Roadheader in Transportation Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 51-62
[7] LIN Hong1 WAN Maosen2.Application of Complete Set Mechanized Operation Line of Boom Roadheader in Construction of Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 188-193
[8] QI Tai-Yue, LI Bin.Application of Boom-type Roadheader in a Metro Tunnel with Complex Cross-sections[J]. MODERN TUNNELLING TECHNOLOGY, 2011,48(4): 32-38
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY