Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2025, Vol. 62 Issue (5) :269-    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Experimental Study on Frost-Heave Behavior of Cement-modified Clayey Silt under Different Construction Procedures
 (1. China Coal Tianjin Design & Engineering Co.Ltd., Tianjin 300120; 2. Stante Key Laboratory of Intelligent Construction and Healthy Operation and Maintenance of Deep Underground Engineering, China University of Mining and Technology, Xuzhou 221116)
Download: PDF (7752KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Cement-stabilization technology has been widely applied in ground-freezing construction for municipal  geotechnical engineering due to its effectiveness in mitigating frost heave. However, existing studies have primarily been conducted under standard laboratory conditions, and the influence of construction procedures remains insufficiently understood. In this study, clayey silt from Tianjin was adopted as the research object, and three sample preparation procedures simulating different construction processes (DSC, SC, and SCP) were designed. Frost-heave tests were systematically conducted under varying cement contents and curing ages. The results indicate that cemented soil prepared using the DSC procedure exhibits a “frost-shrinkage-frost-heave-stabilization” evolution pattern, while SC specimens show only slight frost shrinkage at high cement contents, and SCP specimens yield the highest frost-heave ratios overall. Frost heave is negatively correlated with both cement content and curing age, with the former having a more significant impact. The sensitivity of frost heave to cement content follows: SCP > SC > DSC, whereas the sensitivity to curing age follows: SC > DSC > SCP.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
GUO Zhijie1 CAO Yi2 REN Meng1 HOU Yingxia1 WANG Yansen2 LIANG Hongzhen1 LI Wei1 ZHANG Ling1
KeywordsCemented soil   Frost-heave behavior   Frost-heave mitigation   Comparative analysis   Construction procedure     
Abstract: Cement-stabilization technology has been widely applied in ground-freezing construction for municipal  geotechnical engineering due to its effectiveness in mitigating frost heave. However, existing studies have primarily been conducted under standard laboratory conditions, and the influence of construction procedures remains insufficiently understood. In this study, clayey silt from Tianjin was adopted as the research object, and three sample preparation procedures simulating different construction processes (DSC, SC, and SCP) were designed. Frost-heave tests were systematically conducted under varying cement contents and curing ages. The results indicate that cemented soil prepared using the DSC procedure exhibits a “frost-shrinkage-frost-heave-stabilization” evolution pattern, while SC specimens show only slight frost shrinkage at high cement contents, and SCP specimens yield the highest frost-heave ratios overall. Frost heave is negatively correlated with both cement content and curing age, with the former having a more significant impact. The sensitivity of frost heave to cement content follows: SCP > SC > DSC, whereas the sensitivity to curing age follows: SC > DSC > SCP.
KeywordsCemented soil,   Frost-heave behavior,   Frost-heave mitigation,   Comparative analysis,   Construction procedure     
Cite this article:   
GUO Zhijie1 CAO Yi2 REN Meng1 HOU Yingxia1 WANG Yansen2 LIANG Hongzhen1 LI Wei1 ZHANG Ling1 .Experimental Study on Frost-Heave Behavior of Cement-modified Clayey Silt under Different Construction Procedures[J]  MODERN TUNNELLING TECHNOLOGY, 2025,V62(5): 269-
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2025/V62/I5/269
 
No references of article
[1] YANG Shaoyu1 WANG Xiaotian2 ZHANG Peiyuan1 LIU Shengchen1 LI Shuchen2 LI Luoning2.A Review of Spray-applied Waterproofing Membrane Technology for Drill-and-Blast Tunnels [J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 1-14
[2] SHAN Hongwei1 SUN Mao2 XIAN Jianping2 ZHU Li2 YU Haitao3.Mechanical Properties of Prefabricated Assembly Utility Tunnel Construction and Field Full-scale Test Study in the Process of Erection of Utility Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 147-153
[3] LIU Shijie LIU Ze WU Jianhe ZHONG Youjiang.Ground Surface Grouting Techniques for the Railway Tunnel in Completely Weathered Granite Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(6): 181-186
[4] SUN Guoqing PENG Feng ZOU Mingbo.Research and Application of New Grouting Technology with Rigid Sleeve Valve Pipe Strand[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 186-191
[5] YUAN Rongtao1 ZHAI Renfeng2 CHEN Haitao1.Application of Innovative Waterproof Board Laying Trolley in the Beitaizi Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 206-211
[6] JIANG Yajun1 YANG Qixin1 LIU Dongmin2 SHENG Caoying3.Application and Development of a Sprayed Waterproof Membrane for Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 11-19
[7] CHEN Fangmin1 DING Zhi2 LI Shaolang2 ZHANG Mengya2 ZHOU Lianying2.Model Test of Strain Development in Cement Soil under Subway Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 127-133
[8] GUO Jun1 WU Gang2 SHEN Yongfang2 XI Xiaozhou2.Full-Scale Model Test for Sand-Filling Foundation Construction Technology in the Nanchang Honggu Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(6): 56-62
[9] DOU Ji-Ping-1, Chen-De-Jian-2.Countermeasures and Construction Technologies for Clearance Intrusion of the Primary Support in the Sujiawan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(6): 154-159
[10] XIAO Guang-Zhi, You, Xu.Application of the Advance Support of High-Pressure Horizontal Jet Grouting Piles in Tunnel Engineering[J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(2): 108-114
[11] .Design and Construction of the Underpinning of a River-Crossing
Bridge Pile Foundation in a Metro Tunnel
[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(4): 164-169
[12] JI Xia-Fang, CHANG Bao.Discussion of Water Stop Construction Technology for the Construction Joints of a Tunnel Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(4): 170-173
[13] WANG Qing-Lin-1,HAO Jun-Suo-2, SHEN Dian-Cheng-2.Construction Techniques for Advance Drilling in the Meilingguan Gas Tunnel on the Lanzhou-Chongqing Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(4): 89-93
[14] DENG Bin-1, GU Xiao-Fang-2.Shield Construction Risks and Quality Control Measures for Lot 2222 of the Shenzhen Metro Line 2[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(2): 21-27
[15] WANG Jie-1, Yang-Ping-1, WANG Xu-Nuo-1, Bao-Jun-An-1.Measurement and Research of the Horizontal Freezing Temperature After Cement Soil Reinforcement in a Shield Launch Shaft[J]. MODERN TUNNELLING TECHNOLOGY, 2011,48(6): 99-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY