Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2014, Vol. 51 Issue (4) :155-160    DOI:
Article Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Analytical Formula for Segment Dimensions of a Shield Tunnel
(1 Chengdu Normal University, Chengdu 611130; 2 Sichuan Vocational and Technical College of Communications, Chengdu 611130)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract  The AutoCAD software drawing method is commonly used for the design of segment dimensions of a shield tunnel. However, some approximations and a cumbersome design process make the results hard to be verify. In this paper, an analytic formula associated with segment dimensions is derived based on knowledge of analytic geometry and segment structure characteristics. The analyses show that not only can an exact solution of segment dimensions be achieved by using this method, but also that design efficiency can be improved and drawing results can be verified conveniently.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
YANG Qun-1
Xie-Li-Guang-2
Keywords Shield tunnel   Segment dimensions   Design method   Analytical solution     
Abstract: The AutoCAD software drawing method is commonly used for the design of segment dimensions of a shield tunnel. However, some approximations and a cumbersome design process make the results hard to be verify. In this paper, an analytic formula associated with segment dimensions is derived based on knowledge of analytic geometry and segment structure characteristics. The analyses show that not only can an exact solution of segment dimensions be achieved by using this method, but also that design efficiency can be improved and drawing results can be verified conveniently.
Keywords Shield tunnel,   Segment dimensions,   Design method,   Analytical solution     
published: 2014-01-02
Cite this article:   
YANG Qun-1, Xie-Li-Guang-2 .Analytical Formula for Segment Dimensions of a Shield Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(4): 155-160
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2014/V51/I4/155
 
No references of article
[1] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[2] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[3] ZHANG Yang1 LIU Shannan1 WU Jun1 CHEN Jiakang1 XIAO Xiaochun2 LI Lei2.Sensitivity and Its Impact of Strata Parameters on Ground Surface Settlements during Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 127-134
[4] ZHOU Jixue1,2.Experimental Study of Soil Conditioning with Foam for the Shield Tunnel in Composite Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 194-199
[5] TIAN Zhiwang1 XU Youjun2.Study on the Law of Transverse Seismic Response of Two Paralleled Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 57-64
[6] JIA Fuzi1,2 WANG Lifeng1 YE Junneng3 PANG Jin1 LU Wuquan1.Influence of Strata Characteristics on Ground Settlement Induced by Shield Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 85-91
[7] ZHU Yaohong1 LIU Xian2 ZHANG Chen2 LI Haitao2.Experimental Study on Mechanical Behaviors of Staggered Shield Tunnel Segment Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 123-132
[8] JIA Yi1 LI Fuhai1,2 WU Debao1 WANG Yongbao3.Experimental Study on Mix Proportions of Synchronous Two-component Grouting for Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 143-515
[9] WEN Zhuyin.On the Waterproof Technology of Segment Joints in the Zhoujiazui Road River-crossing Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 152-157
[10] ZHU Yaohong1 ZHANG Yumeng2 XIA Yangyuyu2 DONG Zibo3 LIU Xian2.Full-scale Test on Ultimate Bearing Capacity of Tunnel Segment Lining with Staggered Joints[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(6): 152-162
[11] LIN Xiao-Dong-1, DING Wen-Qi-1, LI Xiao-Jun-1, XI Yue-1, YUAN Quan-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 19-26
[12] TAO Li-1, ZHOU Biao-2, LIU Chao-3, XIE Xiong-Yao-2, LI Qian-Wen-1.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 27-32
[13] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 61-71
[14] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 72-78
[15] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 79-87
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY