Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2014, Vol. 51 Issue (6) :58-65    DOI:
Article Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Fuzzy Clustering Theory Based Rock Mass Cuttability Classification Prediction Model for TBM Tunnelling
(School of Mechanical Engineering, Tianjin University, Tianjin 300072)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In this paper, systematic and quantitative studies are carried out regarding rock cuttability by a TBM under complex geological conditions. Based on the fuzzy clustering theory and construction sample analysis, a rock cuttability classification prediction model is established by using the rate of penetration (ROP) as a basic index. The ROP is related to four property indexes: rock uniaxial compressive strength, rock integrity coefficient, the angle between the rock structural plane and the tunnel axis, and water seepage. In the prediction model, the rock mass cuttability is classified into three levels: good, moderate, and poor. Furthermore the prediction model is refined to improve model precision and geological applicability. According to the prediction results for the West Qinling tunnel and the Dahuofang water conveyance tunnel projects, the ROP of the TBM basically agrees with that of the prediction model, proving the feasibility, scientific soundness, and availability of the rock cuttability classification prediction model and providing a basis for the selection, design, and construction of the TBM.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WANG Pan
Guo-Wei
Zhu-Dian-Hua
KeywordsTBM   Sample data   Fuzzy clustering theory   Classification of surrounding rock cuttability     
Abstract: In this paper, systematic and quantitative studies are carried out regarding rock cuttability by a TBM under complex geological conditions. Based on the fuzzy clustering theory and construction sample analysis, a rock cuttability classification prediction model is established by using the rate of penetration (ROP) as a basic index. The ROP is related to four property indexes: rock uniaxial compressive strength, rock integrity coefficient, the angle between the rock structural plane and the tunnel axis, and water seepage. In the prediction model, the rock mass cuttability is classified into three levels: good, moderate, and poor. Furthermore the prediction model is refined to improve model precision and geological applicability. According to the prediction results for the West Qinling tunnel and the Dahuofang water conveyance tunnel projects, the ROP of the TBM basically agrees with that of the prediction model, proving the feasibility, scientific soundness, and availability of the rock cuttability classification prediction model and providing a basis for the selection, design, and construction of the TBM.
KeywordsTBM,   Sample data,   Fuzzy clustering theory,   Classification of surrounding rock cuttability     
published: 2014-09-01
Cite this article:   
WANG Pan, Guo-Wei, Zhu-Dian-Hua .Fuzzy Clustering Theory Based Rock Mass Cuttability Classification Prediction Model for TBM Tunnelling [J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(6): 58-65
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2014/V51/I6/58
 
No references of article
[1] ZHANG Meining1,2 SONG Zhanping1,2,3 YUE Bo4 LI Xu1,2,3 ZHAO Yirui2 TAO Lei5.Research on Construction and Application of a Rapid Tunnel Surrounding Rock Classification Model Based on Real-time Images and Advanced Geological Information[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 87-97
[2] CHEN Zhimin LIU Baoli XU Jiangtao.Study on Shear Characteristics and Classifications of Moraine Considering Gravel Content[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 38-47
[3] XU Jianfeng1 ZHANG Xiangchuan1 QIN Guifang1 KUANG Huajiang1 LIU Guanghui1 DENG Xingxing1.Intelligent Identification Method of Surrounding Rock Grades of Tunnel Face Based on Drilling Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 79-87
[4] YU Yu QI Chun YANG Jianmin LUO Lusen.Progress and Prospect of Loess Tunnel Construction Technology[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 80-89
[5] QU Jianrong1 JING Yawen2 REN Zhaodan1 XIONG Ying2 CHEN Xuefeng1 FENG Jimeng2.Study on Correction of Surrounding Rock Classification for Single-tube Four-lane Highway Tunnel Based on the Failure Characteristics of Surrounding Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 48-55
[6] LIANG Qingguo1 CHEN Kelin1 WANG Shang1 SHI Baodong1 ZHANG Tangjie2.Reflection on Several Issues in Scientific Research on Loess Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 7-17
[7] ZHENG Yingren1 ABI Erdi2.On Stability Analysis and Classification of Surrounding Rocks in Rock Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 1-13
[8] LIAO Jun1 DONG Qian1 LIANG Hongyong2 JIAN Bo2 SHI Yuchuan1,3 GONG Hongwei1.Preliminary Study on the Classification Indexes of Surrounding Rock for the Highway Tunnel in Nearly Horizontal Red-bed Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 25-29
[9] DENG Mingjiang1 TAN Zhongsheng2.Some Issues during TBM Trial Advance of Super-long Tunnel Group and Development Direction of Construction Technology[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 1-12
[10] WEI Xingcan LIU Siding XIAO Huabo WANG Gang.Study on Surrounding Rock Classification of the Underground Powerhouse of Lenggu Hydropower Station[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 22-26
[11] LI Ke.Classification Method for Tunnel Surrounding Rock Based on the EntropyCloud Model[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 69-75
[12] WU Youyin ZUO Qingjun YAN Tianxi.Surrounding Rock Classification of Banxi Group Slate with Abundant Water[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(3): 61-68
[13] WU Dong-Peng- 1 Yang-Xin-An- 2.Rock Classification for a Tunnel Excavated by Rotary Drum Cutter[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(4): 16-21
[14] CONG Yu1, 2, 3 GUO Hui4 ZHENG Yingren3 FENG Xiating2 ABI Erdi2, 3 WANG Zaiquan1.On the Rock Classification Method for Metro Engineering[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(3): 33-41
[15] Yu Li1 You Zhemin2 Chen Jianping1 Sun Yang1 Zheng Wei1.Rock Classification for Tunnels in High Geostress Areas[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(3): 23-30
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY