软土深层盾构开挖引起的地表隆沉时效规律分析

Analysis of the Aging Law of Surface Uplift Caused by Deep Shield Excavation in Soft Soil

  • 摘要: 软土地区深部地层盾构隧道开挖所引起的地表隆沉,主要受施工参数取值及其与地层参数匹配性的影响。与浅部地层开挖不同,软土深部地层开挖所引起的地表扰动会受到软土长期蠕变时效性的显著影响。为此,在上海地区软土深部地层同一地段的不同断面,通过调整深部地层盾构施工参数开展实测分析研究。针对盾构刀盘靠近及穿越监测断面时,调整千斤顶推速与土舱压力;在盾尾脱出时,调整注浆参数,获取软土相同场地条件下深埋盾构施工扰动引起的地表时效性规律,分析地表隆沉之间的差异,得到软土深部地层盾构开挖对短期地表隆沉的影响主要源于土舱压力与掘进速度引起的超孔隙水压力;而地表长期隆沉值则主要由盾尾注浆量所控制的蠕变效应决定。施工参数对地表隆沉的影响因子主次顺序为:注浆量、土舱压力、掘进速度。

     

    Abstract: The surface settlement caused by the excavation of the shield tunnel in the deep stratum of the soft soil area is mainly influenced by the value of the construction parameters in the excavation process and the matching with the stratum parameters. Different from the excavation of shallow strata, the surface disturbance caused by the excavation of deep strata in soft soil is significantly affected by the long-term creep time-effect of soft soil. Therefore, in the same section of deep strata in the soft soil area of Shanghai, the actual measurement and analysis research was carried out by adjusting the construction parameters of deep stratum shield. When the shield cutter head approaches and passes through the monitoring section, the jacking speed and soil chamber pressure were adjusted. When the shield tail is out of the ground, the grouting parameters were adjusted to obtain the time-effect law of surface settlement caused by the construction disturbance of deep-buried shield under the same site conditions of soft soil. By analyzing the differences in surface uplift and subsidence, it is concluded that the short-term surface settlement caused by shield excavation in deep soft soil is mainly due to the excess pore water pressure caused by soil tank pressure and tunneling speed, while the long-term surface settlement value is mainly determined by the creep effect controlled by the grouting volume at the shield tail. The main and secondary order of influencing factors of construction parameters on surface settlement is grouting volume, soil chamber pressure, and excavation speed.

     

/

返回文章
返回