圆弧刀盘土压平衡盾构施工沉降影响分析

Analysis of Influence of Arc Cutterhead on Ground Settlement during EPB Shield Construction

  • 摘要: 在盾构隧道施工中,刀盘形式差异会对施工沉降造成一定影响。基于此,文章依据对圆弧和直角刀盘盾构施工前方原岩平衡土压力的受力特性分析,推导了圆弧边缘区域的平衡压力计算公式和圆弧刀盘土舱压力的选取方法,并给出了圆弧刀盘影响系数的定义。采用FLAC3D数值仿真软件,分析了圆弧刀盘、直角刀盘盾构施工的地层沉降差异性及土舱压力、土舱土体重度对地表沉降、掌子面位移的影响。结果表明,数值计算得到的圆弧刀盘与直角刀盘的施工沉降比与理论分析得到的圆弧刀盘影响系数基本一致,说明采用该系数评价直角刀盘与圆弧刀盘的施工沉降差异是可行的。

     

    Abstract: During the shield tunnel construction, the form of cutterhead may have a certain impact on constructioninduced ground settlement. In view of this, the stress characteristics of balanced in-situ soil pressure in front of the arc and rectangular shield cutterheads are analyzed, the calculation formula of the balance pressure in the arc edge area and the selection method of the soil chamber pressure of the arc cutterhead are deduced, and the definition of the influence coefficient of the arc cutterhead is provided as well. FLAC3D numerical simulation software is used to analyze the ground settlement difference induced by excavation of arc and rectangular shield cutterheads, and the effects of soil pressure and soil unit weight in excavation chamber on ground surface settlement and tunnel face displacement. The results show that the ratio of ground settlement induced by arc and rectangular cutterheads obtained by numerical calculation is basically consistent with the influence coefficient of arc cutterhead obtained by theoretical analysis, which means that it is feasible to use this influence coefficient to evaluate the ground settlement differ? ence induced by rectangular and arc cutterheads.

     

/

返回文章
返回