季节性冻土区浅埋隧道两台阶留核心土施工技术

Two-Bench Construction Method with Reserved Core Soil for Shallow-Buried Tunnels in Seasonally Frozen Soil Areas

  • 摘要: 元山隧道地处高原季节性冻土区,为浅埋软岩大断面隧道,原设计采用三台阶七步开挖方法。隧道地层条件主要是石炭系砂岩、泥岩,属V级围岩,含水量较大;受季节性冻融影响,隧道施工中出现了较大变形;通过现场取样试验和理论分析,经综合比选,改用两台阶留核心土开挖方法并增加施工辅助措施,解决了季节性冻土区浅埋软岩隧道施工大变形难题,有效地保证了隧道施工安全和质量,加快了施工进度。

     

    Abstract: The Yuanshan tunnel, located in the seasonally frozen soil of a plateau area, is a shallow-buried tunnel in soft rock with a large section. It was originally designed to be constructed using the three-bench and seven-step method. Large deformations occurred during the construction due to the seasonal freeze-thawing, as the ground is mainly composed of carboniferous sandstone and mudstone classified as a grade V rock mass with abundant water. Based on a field sample test and theoretical analysis, the two-bench construction method with reserved core soil was adopted instead and some auxiliary construction measures were taken after a comprehensive comparison. As a consequence, the problem of large deformation during construction was successfully resolved, guaranteeing the safety and quality of the tunnel construction.

     

/

返回文章
返回