断层隧道爆破开挖的动力响应分析

Dynamic Response Analysis of Blasting Excavation for a Tunnel Passing through Faults

  • 摘要: 由于断层岩体稳定性差,因此断层地带往往是隧道建设的控制性地段。文章通过运用ANSYS/LS-DYNA有限元软件,在爆破荷载作用下对断层隧道进行了三维数值模拟,分析了不同位置下断层对围岩动力响应的影响,总结了围岩竖向位移峰值、竖向振速峰值及最大主应力峰值的分布特征,得到了断层隧道的最不利位置及工况条件,并提出了隧道边墙与断层之间的安全距离。

     

    Abstract: Considering that fault zones are key areas in tunnel construction due to poor stability of rock masses, and based on ANSYS/LS-DYNA software, a 3D numerical simulation under the blasting load is performed for a tunnel passing through faults;the influences of faults at different locations on the dynamic responses of the surrounding rock are analyzed; the distribution characteristics of the peak values of the rock’s vertical displacements, vertical vibration velocities and maximum principal stresses are summarized; the most unfavorable locations and working conditions, as well as the safe distance between the sidewall and fault, are presented for such a tunnel.

     

/