祥和隧道平导软弱围岩变形控制探讨

Discussion on Deformation Control of Xianghe Tunnel Parallel Adit in Soft Surrounding Rocks

  • 摘要: 新建广通至大理铁路祥和隧道全长10 220 m,属I级高风险隧道,于线路右侧设贯通平导。洞身穿越9条断层,岩性变化频繁,受构造影响,岩体破碎、岩质较软。平导在施工过程中常发生变形情况,特别是在侵入岩花岗斑岩、辉绿岩、断层角砾及炭质页岩段。文章通过对区域工程地质特点、软弱围岩变形影响因素等方面进行分析,提出了在平导加强超前地质预报、内轮廓由直墙调整为曲墙式、加强超前支护、引排地下水、提高围岩强度、加强初期支护、增大平导与正洞的净间距等措施。通过以上措施,保证了平导在软弱围岩地段的安全掘进。

     

    Abstract: The 10 220 m long Xianghe tunnel, which is classified as one with grade I risk on the railway from Guangtong to Dali, has a parallel adit excavated at the right side of tunnel. During construction severe deformations were usually encountered, especially at the sections of intrusive rock, granite porphyry, diabase, fault breccias and carbonaceous shale since the tunnel passed through nine faults and the lithology changed frequently, rock mass were found to be broken and soft. In this paper, such countermeasures as advance geological forecast, inner contour adjustment from straight wall to curved wall, advance support, ground water drainage, increasing of rock mass strength, primary support and clear spacing between parallel adit and main tunnel were put forward based on analyzing of geological characteristics and influential factors of rock mass deformation, and safe driving of parallel adit in soft rock mass is guaranteed.

     

/

返回文章
返回