浅埋暗挖原理在西部某隧道冒顶塌方治理中的应用

Principles of the Shallow Bored Tunnel Method Applied to Chimney Collapse Treatment for a Tunnel in Western China

  • 摘要: 西部某山岭隧道地质条件差、埋深浅且偏压,因违规施工、乱用工法而造成隧道冒顶塌方。在处理过程中,根据“浅埋暗挖法”的基本原理,对松散体进行表面封闭,并采用小导管前进式分段注浆超前加固;结合“加固后方、封闭岩面、稳定塌体”的塌方处理原则,对未塌方段预先采用钢拱架和长锚杆加固防止事故扩大,对塌方段采用“上下台阶预留核心土法”进行环向开挖,并采用“小间距型钢拱架”加强支护措施。经过数值模拟计算和现场监控数据反馈,各项治理措施有效合理,可为今后类似工程的处理提供一些经验和参考。

     

    Abstract: A mountain tunnel in western China that is subject to poor geological conditions, shallow buried depth and unsymmetrical pressure encountered a chimney collapse event caused by inappropriate construction and an unreasonable construction method. During the remediation process, surface sealing was used for loose masses, and advanced reinforcement was also adopted using the forward segmented condulet grouting technique based on the “shallow-buried bored excavation method”. According to the collapse treatment principle of “reinforcing the back non-collapsed section, sealing the rock surface and stabilizing the collapsed rock masses,” steel arches and long anchor bolts were used to reinforce the non-collapsed section to prevent the expansion of the accident. For the collapsed sections, the up-and-down bench + reserved core-soil method was used for ring excavation while heavy support was implemented with small-spacing steel arches. According to the feedback of numerical simulation and on-site monitoring data, all the treatment measures are rational and effective and may provide a reference for treatment in similar projects.

     

/

返回文章
返回