铣挖法隧道围岩分级方法研究

Rock Classification for a Tunnel Excavated by Rotary Drum Cutter

  • 摘要: 传统的矿山法隧道围岩分级难以满足铣挖法隧道的施工需要, 因此对铣挖法隧道围岩进行准确分类并掌握其对铣挖机施工的影响非常重要。文章结合赵家湾隧道铣挖机施工实例, 在分析总结铣挖工法地层适应性的基础上, 提出一套兼顾隧道稳定性和施工效率的铣挖法隧道围岩分级流程和方法。在进行围岩稳定性等级划分的基础上, 从不同类型围岩的工程特性出发, 依据正常速度和次生速度将铣挖法隧道围岩工作条件分为 A(工作条件好)、 B (工作条件一般)、 C (工作条件差)、 D (工作条件极差) 四个等级, 并将不具备铣挖法施工条件的围岩定义为E级 (不适宜铣挖法施工)。该方法的提出对铣挖工法地层适应性研究和铣挖法隧道施工具有一定的指导意义。

     

    Abstract: In light of the fact that traditional rock classifications for mined tunnels have difficulty meeting the construction requirements for a tunnel excavated by rotary drum cutter (RDC), it is necessary to set up a rock classification system for tunnels excavated by RDC and to understand the influences on RDC excavation. Using the RDC excavation of the Zhaojiawan tunnel as an example, a rock classification is proposed for the RDC excavated tunnel by considering tunnel stability and construction efficiency based on an analysis of the adaptability of the stratum. To be specific, based on characteristics of different surrounding rocks and the normal and secondary excavation velocities,the rock conditions are divided into 5 grades, i.e., A (good), B(fair), C (poor), D (very poor) and E (unsuited for RDC excavation).

     

/

返回文章
返回