盾构近距离下穿既有古建筑物施工技术研究

Study on Construction Technology for Shield Tunnels Approaching Existing Ancient Buildings

  • 摘要: 上海轨道交通 12号线龙华路站—龙漕路站区间隧道下穿千年古寺——龙华寺。为减少龙华塔的沉降和倾斜, 施工前进行了针对性的盾构改制, 增加了管片注浆孔数;穿越施工过程中采取精细化管理、 均衡施工;穿越后采用打拔管注浆加固的技术措施, 保证了龙华塔的安全, 顺利完成了区间隧道的施工。

     

    Abstract: Since the tunnel from Longhualu station to Longchaolu station of Shanghai metro line 12 would pass underneath a thousand-year old monastery—the Longhua Temple—the shield was refitted by adding more grouting holes on the segments before tunneling in order to reduce the settlement and incline of the Longhua Pagoda. With the application of balanced construction and refined management, as well as the adoption grouting reinforcement method after completion of the undercrossing construction, the Longhua pagoda was kept safe and stable while the construction of the subway tunnel was successfully completed.

     

/