富水砂层盾构隧道下穿独立浅基础铁路桥加固方案比选研究

Comparative Study on Reinforcement Schemes for Shield Tunnel Under-crossing Railway Bridge with Isolated Shallow Foundation in Water-rich Sand Stratum

  • 摘要: 为保证富水砂层中盾构隧道下穿独立浅基础铁路桥的施工安全,以南昌地铁4号线下穿京九铁路青山路立交桥为工程背景,采用工法比选、数值分析、现场监测等方法,提出了地表注浆和现浇筏板基础框架涵的加固措施,分析了轨道沉降规律,验证了加固措施的有效性。研究结果表明:在盾构隧道下穿施工前,采用地层注浆和现浇筏板基础框架涵对铁路桥进行加固,实现对轨道沉降的控制,是合理且有效的;相较于不采取任何加固措施的工况,轨道沉降最大值为1.88 mm,减少了83.53%;现场监测结果显示,采取地表注浆和现浇筏板基础框架涵加固后轨道沉降最大值为1.45 mm,验证了数值分析结果的正确性和加固措施的有效性,保证了京九铁路干线的正常运营。

     

    Abstract: In order to ensure the construction safety of shield tunnel undercrossing isolated shallow foundation railway bridge in water-rich sand stratum, taking Nanchang Metro Line 4 undercrossing Qingshan Road overpass of Bei?jing-Kowloon Railway as the engineering background, the reinforcement measures of stratum grouting and cast-inplace raft foundation frame culvert are put forward by means of construction method comparison, numerical analysis and field monitoring. The law of track settlement is analyzed, and the effectiveness of reinforcement measures is verified. The results show that it is reasonable and effective to use stratum grouting and cast-in-place raft foundation frame culvert to reinforce the railway bridge and realize the control of track settlement before shield tunnelling. Compared with the condition without any reinforcement measures, the maximum value of track settlement is reduced by 83.53%, which is 1.88 mm. The field monitoring results show that the maximum settlement of the track is 1.45 mm after stratum grouting and cast-in-place raft foundation frame culvert reinforcement, which verifies the correctness of the numerical analysis results and the effectiveness of the reinforcement measures, and ensures the normal operation of the Beijing-Kowloon Railway.

     

/

返回文章
返回