软土盾构隧道芳纶布加固机理和效果研究

The Mechanism and Effects of AFRP Reinforcement for a Shield Tunnel in Soft Soil

  • 摘要: 运营盾构隧道的横向收敛变形直接关系到隧道的结构安全,粘贴芳纶布是常用的隧道变形整治加固方法之一,然而目前对其加固机理和加固效果还不明确。论文利用数值模拟方法,以隧道横向收敛变形和接缝张开量为指标,探讨了芳纶布对隧道横向变形的加固机理和加固效果;针对芳纶布粘贴时机与粘贴层数对加固效果的影响进行了参数影响分析。研究发现,粘贴芳纶布能有效地限制隧道横向收敛和接头变形,但芳纶布加固效果受隧道变形程度的影响,即隧道变形越小,加固效果越好;增加芳纶布粘贴层数,可以显著提高加固效果,最佳加固层数为2~3层。

     

    Abstract: Since the horizontal convergence of a shield tunnel is directly related to tunnel safety, AFRP (Aramid Fiber Reinforced Polymer) reinforcement is one of the commonly used treatment methods for deformation. In this paper, its mechanism and effects are discussed using a numerical simulation based on the horizontal convergence and joint opening, and the influence of AFRP pasting time and number of layers on the effects of reinforcement are analyzed in light of related parameters. The results show that: AFRP reinforcement can effectively restrict horizontal convergence and joint deformation, but the reinforcement effect is affected by the extent of tunnel deformation, i.e., the smaller the deformation, the better the reinforcement; and the reinforcement effect may increase significantly with an increase in the AFRP layers, with 2~3 being the best choice for layer numbers.

     

/

返回文章
返回