HONG Kairong LIU Yongsheng PAN Yue. Development and Prospects of Construction Technology in Drill-and-Blast Mountain TunnelJ. Modern Tunnelling Technology, 2024, 61(2): 67-79.
Citation: HONG Kairong LIU Yongsheng PAN Yue. Development and Prospects of Construction Technology in Drill-and-Blast Mountain TunnelJ. Modern Tunnelling Technology, 2024, 61(2): 67-79.

Development and Prospects of Construction Technology in Drill-and-Blast Mountain Tunnel

  • As mountain tunnels evolve towards greater height, depth, size, and length, the drill-and-blast construc? tion technique is gradually becoming inadequate to meet the current demands of tunnel construction. This paper reviews the development status and challenges faced by the drill-and-blast construction technique in mountainous tunnels, covering aspects such as construction theory, technology, equipment configuration, and environmental protection. It provides a comprehensive review of the evolution of drill-andblast techniques, summarizes the current technical status of drill-and-blast tunnels, identifies the existing technological bottlenecks and industry pain points,and anticipates future development trends for drill-and-blast mountain tunnel construction technology, aiming to offer references for the future advancement.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return