TIAN Zhiyu1 LIN Guojin1 WU Qingfa2 WANG Bo3 ZHANG Zhaojie. Suggestions for Revision of Some Clauses of Structure Calculations in the“JTG D70-2004 Code for Design of Road TunnelsJ. Modern Tunnelling Technology, 2017, 54(5): 13-17.
Citation: TIAN Zhiyu1 LIN Guojin1 WU Qingfa2 WANG Bo3 ZHANG Zhaojie. Suggestions for Revision of Some Clauses of Structure Calculations in the“JTG D70-2004 Code for Design of Road TunnelsJ. Modern Tunnelling Technology, 2017, 54(5): 13-17.

Suggestions for Revision of Some Clauses of Structure Calculations in the“JTG D70-2004 Code for Design of Road Tunnels

  • Based on experience with the design and construction of highway tunnels, this paper discusses some problems in relevant clauses of the“JTG D70-2004 Code for Design of Road Tunnels”, especially the load calculation method for open-cut tunnels, the load calculation method for shallow-buried tunnels, and the reinforcement cal?culation method for flexural and compressive reinforced concrete members. Corresponding suggestions are proposed for specification preparation and revision.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return