[an error occurred while processing this directive]
|
现代隧道技术 ![]() ![]() |
|
||||
大断面黄土隧道初期支护与围岩相互作用机理研究 | ||||
(1 中交第二公路勘察设计研究院有限公司,武汉 430056; 2 北京交通大学 土建学院,北京 100044) |
||||
On the Interaction Mechanism of the Primary Support and Rock Mass in a Loess Tunnel with a Large Section | ||||
(1 CCCC Second Highway Consultants Co. Ltd, Wuhan 430056; 2 School of Civil Engineering and Architecture, Beijing Jiaotong University, Beijing 100044) |
|
Copyright 2010 by 现代隧道技术
|