Study on Freezing Method Applied for Large Diameter River-crossing
Shield Tunnel in Nanjing City
(CCCC Second Highway Consultants Co. Ltd , Wuhan 430056)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The river-crossing passage through Weisan Road of Nanjing will be built by shield tunneling, with two storeys, two-way four lanes and 14.5m diameter. The north exit approach mainly passes through muddy silt with rich water and low bearing capacity, and it is difficult to ensure the stability of soil and effective waterproofing by ordinary consolidation method. So it was designed to adopt artificial ground freezing. With the help of numerical method incorporating the site conditions, the effect of soil frost swelling on safety of diaphragm wall was studied, and the effect of local freezing and overall freezing on surface deformations was analyzed. In addition the reasonable thickness of freezing wall was studied. Research results showed that the diaphragm deformed a little due to large carrying capacity after the closure of freezing wall, the force bearing capacity of freezing wall and deformations were large after dismantling the sealing door on the wall and the distribution diagram of bending moments and displacements took the form of paraboloid at tunnel center. Compared with the overall freezing, local freezing could well control the freezing deformations and significantly reduce the surface heaving induced by freezing. When the thickness of freezing wall was 3.9m, the min.safety factor was 4.1 and max. deformation was 23.2mm. And when the thickness of freezing wall was 3 m, the min. safety factor was 3 and the max. deformation was 35.5mm. Taking the actual site conditions into consideration, the thickness of freezing wall of 3.9m is conservative and uneconomic and it is suggested that 3.0m should be taken.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WEI Long-Hai
Guo-Xiao-Hong
Qiao-Chun-Jiang
Shi-Shi-Bo
KeywordsRiver-crossing tunnel   Large diameter shield   shield breakthrough   Freezing method   Numerical simulation     
Abstract: The river-crossing passage through Weisan Road of Nanjing will be built by shield tunneling, with two storeys, two-way four lanes and 14.5m diameter. The north exit approach mainly passes through muddy silt with rich water and low bearing capacity, and it is difficult to ensure the stability of soil and effective waterproofing by ordinary consolidation method. So it was designed to adopt artificial ground freezing. With the help of numerical method incorporating the site conditions, the effect of soil frost swelling on safety of diaphragm wall was studied, and the effect of local freezing and overall freezing on surface deformations was analyzed. In addition the reasonable thickness of freezing wall was studied. Research results showed that the diaphragm deformed a little due to large carrying capacity after the closure of freezing wall, the force bearing capacity of freezing wall and deformations were large after dismantling the sealing door on the wall and the distribution diagram of bending moments and displacements took the form of paraboloid at tunnel center. Compared with the overall freezing, local freezing could well control the freezing deformations and significantly reduce the surface heaving induced by freezing. When the thickness of freezing wall was 3.9m, the min.safety factor was 4.1 and max. deformation was 23.2mm. And when the thickness of freezing wall was 3 m, the min. safety factor was 3 and the max. deformation was 35.5mm. Taking the actual site conditions into consideration, the thickness of freezing wall of 3.9m is conservative and uneconomic and it is suggested that 3.0m should be taken.
KeywordsRiver-crossing tunnel,   Large diameter shield,   shield breakthrough,   Freezing method,   Numerical simulation     
published: 2010-12-03
Cite this article:   
WEI Long-Hai, Guo-Xiao-Hong, Qiao-Chun-Jiang etc .Study on Freezing Method Applied for Large Diameter River-crossing
Shield Tunnel in Nanjing City[J]  MODERN TUNNELLING TECHNOLOGY, 2011,V48(3): 80-86
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2011/V48/I3/80
 
No references of article
[1] REN Wei1 WANG Song2 WANG Long3.Analysis on Dewatering Test of Foundation Pit in Stratum with Small Permeability[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 188-193
[2] LEI Shuai1,2 FANG Yong3 LIU Jing4 HUANG Lei1, 2.Research of Construction Ventilation Optimization for Huayingshan Tunnel on Nanchong-Dazu-Liangping Expressway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 194-200
[3] WEI Gang1 LU Shijie2.Present Status and Prospects of Research on Flexible Joint Models of Immersed Tube Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 6-13
[4] LIU Haitao1 ZHOU Hui2 HU Dawei2 GAO Yang2.Coupled Thermo-mechanical Numerical Simulation of the Radioactive Waste Repository[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 47-55
[5] ZHOU Lei ZHU Zheming LIU Bang ZHAO Yanlin ZHOU Qin.Influence of Crack Location and Depth on Stability of Surrounding Rock Mass[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 130-138
[6] YAN Zihai1,2 ZHANG Lifeng1,2 LU Junfu3 ZOU Jinjie1,2.Study on Construction Method of the Intersection of the Urban Underground Interchange Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 176-184
[7] LIU Haitao1 ZHOU Hui2 LU Jingjing2 HU Dawei2 YANG Fanjie2.A Sampling-Based Probabilistic Prediction Method of Rockbursts in Deep-buried Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(6): 59-66
[8] YUAN Shaodong1 YANG Lin2 HUANG Jian2.Effect of Sequential Excavation of the Second Tunnel Tube on Transverse and Longitudinal Ground Settlements of the First Tunnel Tube in Parallel Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(6): 80-86
[9] HAO Zhitao1,2 CAO Wufu1,2 WANG Ting1,2.Contrastive Analysis of Working Face Stability in Cases of Climbing Excavation and Horizontal Excavation[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(6): 94-100
[10] ZHAO Yongjian1 GONG Yi2 DING Yong2 DONG Xuehua2.Effect of Explosion in a Gas Pipeline Compartment of a Utility Tunnel on Neighboring Metro Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(6): 139-143
[11] WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[12] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 61-71
[13] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 115-123
[14] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 140-145
[15] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 188-200
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY