Metro construction; AHP; Fuzzy comparison method,Assesment index," /> Application of the AHP-Based Fuzzy Comparison Method in Metro Construction
 
   Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2013, Vol. 50 Issue (5) :123-128    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Application of the AHP-Based Fuzzy Comparison Method in Metro Construction
(China Railway 14th Construction Bureau Co. Ltd., Jinan 250002)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Firstly the basic components of fuzzy theory and AHP and the calculation steps of AHP-based fuzzy comparison method are introduced. Then, using the construction of the No.2 air duct of the Dawanglu station of the Beijing Metro line 14 as an example, the two construction methods (the mined method and the cut and cover method) are compared with the AHP-based fuzzy method based on the comparison criteria of economic benefit, environmental benefit, and applicable benefit. Finally the decision of mined method is made based on all these factors.
Service
Email this article  Metro construction; AHP; Fuzzy comparison method; Assesment index”. Please open it by linking:" name=neirong>
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
Keywords Metro construction; AHP; Fuzzy comparison method')" href="#">     
Abstract: Firstly the basic components of fuzzy theory and AHP and the calculation steps of AHP-based fuzzy comparison method are introduced. Then, using the construction of the No.2 air duct of the Dawanglu station of the Beijing Metro line 14 as an example, the two construction methods (the mined method and the cut and cover method) are compared with the AHP-based fuzzy method based on the comparison criteria of economic benefit, environmental benefit, and applicable benefit. Finally the decision of mined method is made based on all these factors.
Keywords Metro construction; AHP; Fuzzy comparison method')" href="#">     
Cite this article:   
.Application of the AHP-Based Fuzzy Comparison Method in Metro Construction[J]  MODERN TUNNELLING TECHNOLOGY, 2013,V50(5): 123-128
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2013/V50/I5/123
 
No references of article
没有找到本文相关文献
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY