Water transfer;Tunnel,Small pilot heading,Smooth blasting," /> Advance Blasting Excavation Techniques for Small Pilot Headings  in Hard Rock Tunnels
 
   Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2013, Vol. 50 Issue (6) :169-173    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Advance Blasting Excavation Techniques for Small Pilot Headings  in Hard Rock Tunnels
(Liaoning Provincial Department of Water Resources, Shenyang 110003)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract A water transfer tunnel in hard rock with a small cross section, which was originally constructed by the full-face drill and blast method, suffered from a low advance rate and affected the construction schedule since the depth of the wedge cut hole was limited by the section width. In light of this setback, a new construction method was proposed. First, the pilot heading is excavated by advance blasting, and then the tunnel is enlarged by smooth-blasting. This paper details the construction procedures, cut hole pattern, blasting parameters, and testing results regarding the new construction method. The results show that, compared with conventional full-face excavation, the new construction method increases the advance rate, improves smooth blasting quality, and reduces construction costs significantly.
Service
Email this article  Water transfer;Tunnel; Small pilot heading; Smooth blasting”. Please open it by linking:" name=neirong>
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
Keywords Water transfer;Tunnel')" href="#">     
Abstract: A water transfer tunnel in hard rock with a small cross section, which was originally constructed by the full-face drill and blast method, suffered from a low advance rate and affected the construction schedule since the depth of the wedge cut hole was limited by the section width. In light of this setback, a new construction method was proposed. First, the pilot heading is excavated by advance blasting, and then the tunnel is enlarged by smooth-blasting. This paper details the construction procedures, cut hole pattern, blasting parameters, and testing results regarding the new construction method. The results show that, compared with conventional full-face excavation, the new construction method increases the advance rate, improves smooth blasting quality, and reduces construction costs significantly.
Keywords Water transfer;Tunnel')" href="#">     
published: 2013-05-25
Cite this article:   
.Advance Blasting Excavation Techniques for Small Pilot Headings  in Hard Rock Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2013,V50(6): 169-173
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2013/V50/I6/169
 
No references of article
[1] ZI Xiaoyu1 SHEN Yusheng1 ZHU Shuangyan1 LUO Ningning2 YANG Jiaqi1 CAO Bangjun1.Study on the Deformation Failure Laws and Support Measures for Tunnels in Layered Phyllite[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 196-204
[2] WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[3] Shu Heng, Wu Shuyuan, Li Jian, Guo Xiaohong.Health Monitoring Design for Extra-Large Diameter Underwater Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 32-40
[4] Tuo Yongfei, Guo Xiaohong.General Design and Key Technologies of the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 1-6
[5] Lin Xin1, Shu Heng1, Zhang Yaguo2, Yang Linsong1, Li Jin1, Guo Xiaohong1.Study of the Longitudial Profile Optimization of Large-Diameter Shield Tunnels in Mixed Ground with Very High Water Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 7-14
[6] Yao Zhanhu1, Yang Zhao2, Tian Yi1, Hu Huitao1.Key Construction Technology for the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 15-23
[7] Liu Guangfeng1, Chen Fangwei2, Zhou Zhi1, Zhang Shilong3, Liu Mingqiang1.Identification of Investment Risks for River-Crossing Tunnels Based on Grey Fuzzy Multi-Attribute Group Decision Making[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 41-48
[8] Yao Zhanhu.Construction Risk Assessment for the Shield-Driven Section of the Nanjing Weisan Road River-Crossing Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 49-54
[9] Zhang Boyang1, Zhao Xiaopeng1, Zhang Yaguo2, Chen Yu1.Risk Control for Saturated Hyperbaric Intervention in Slurry Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 55-61
[10] Li Xinyu, Zhang Dingli, Fang Qian, Song Haoran.On Water Burst Patterns in Underwater Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 24-31
[11] Jiang Wei1, Liu Xin2, Liu Xian2, Luo Yao2, Yuan Yong2, Wang Shengnian3, Su Quanke4.Full-Scale Test of the Early Performance of a Factory-Prefabricated Immersed Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 135-142
[12] Yan Tao1,2, Wang Mingnian1, Guo Chun1, Chen Hanbo1, Xie Wenqiang1.Key Techniques for the Diffused Oxygen Supply of an Extra-Long Highway Tunnel in a High-Altitude Area[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 180-185
[13] Pan Changping1,2,3, Wu Qing1,2,3, Zhai Mingang1,2,3, Zou Shun1,2,3.Dynamic Response Analysis of the Impact of a Rockfall on a Cantilever Shed Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 155-159
[14] Lai Jinxing1,5, Qiu Junling1,5, Pan Yunpeng2, Cao Xiaojun3, Liu Chi1,4, Fan Haobo1,5.Comprehensive Monitoring and Analysis of Segment Cracking in Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 186-191
[15] Li Tiecheng, Zou Chunhua.TBM Selection for a Long-Distance Inclined Coal Mine Shaft with a Large Gradient in Water-Rich Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 174-179
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY