Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2022, Vol. 59 Issue (3) :220-226    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Research on Risk Assessment and Management Methods for Projects of Railway Tunnels Passing under Expressways
(China Railway Construction Kunlun Road and Bridge Engineering Co., Ltd., Chendu 610000)
Download: PDF (2942KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract This paper puts forward a quantitative risk assessment concept combined with numerical simulation analy? sis to address the risks of the high-speed railway tunnel project passing under an expressway. Firstly, a risk assessment index system is established by analyzing similar project experiences and taking into account the actual project context, and the overall system and inter-layer weights are ranked by the hierarchical analysis method. Secondly, on the basis of the numerical simulation results, a fuzzy comprehensive evaluation is made for the risk probability and consequences of the project, and the initial evaluation result of risks for the project is "moderate" risk. Finally, the corresponding risk control countermeasures are proposed for the main sources of risks, the risk reassessment is carried out according to the same procedure, and the result is "mild" risk, which indicates that the risk control measures are feasible and can provide guidance for the project.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
TANG Yan
KeywordsRisk assessment   Hierarchical analysis   Numerical simulation   Fuzzy comprehensive evaluation     
Abstract: This paper puts forward a quantitative risk assessment concept combined with numerical simulation analy? sis to address the risks of the high-speed railway tunnel project passing under an expressway. Firstly, a risk assessment index system is established by analyzing similar project experiences and taking into account the actual project context, and the overall system and inter-layer weights are ranked by the hierarchical analysis method. Secondly, on the basis of the numerical simulation results, a fuzzy comprehensive evaluation is made for the risk probability and consequences of the project, and the initial evaluation result of risks for the project is "moderate" risk. Finally, the corresponding risk control countermeasures are proposed for the main sources of risks, the risk reassessment is carried out according to the same procedure, and the result is "mild" risk, which indicates that the risk control measures are feasible and can provide guidance for the project.
KeywordsRisk assessment,   Hierarchical analysis,   Numerical simulation,   Fuzzy comprehensive evaluation     
Cite this article:   
TANG Yan .Research on Risk Assessment and Management Methods for Projects of Railway Tunnels Passing under Expressways[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(3): 220-226
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I3/220
 
No references of article
[1] MIAO Chenyang1 HUANG Qiangbing1,2 GOU Yuxuan1 TENG Hongquan3 JIA Shaochun4.Study on the Impact of Shield Tunnel Under-crossing at Ground Fissure Site on Existing Utility Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 155-165
[2] ZHU Muyuan1 WEI Lifeng1 FANG Yong1 FU Qiang2 GAO Tengda2 PU Song1.Analysis and Control of the Settlement of Super-large Diameter Shield Tunnel Passing under the Yellow River Embankment[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 211-219
[3] WEI Zhiyuan1 FENG Jimeng2 YU Longping2.Study on the Mechanical Behavior of the the Double-layer Arch Cover Initial Support during the Construction of Subway Stations by Arch-cover Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 265-274
[4] YU Lingfeng.Research on the Characteristics of Structural Dynamic Response and the Seismic Mechanism of Mountain Tunnels with Different Depths[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 227-235
[5] SHI Yufeng1,2 CAO Chengwei1,2 TAN Yifan3 XU Changjie1,2,4 ZHANG Lichen5 HUANG Yong5.Study on Dynamic Response and Long-term Settlement of Water-saturated Weathered Soft Rocks at the Base of Subway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 86-95
[6] ZHANG Fujun1 HU Jun2,3 DUAN Yu4 ZHU Caihui4.Optimization and Application of the Treatment Schemes for Water Inrush in a Water-rich Tunnel in Fault Zones[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 122-131
[7] CHENG Yongchun1 ZENG Xiangji1 WANG Zhenjia1 WANG Dong1 YANG Yun2 WU Yongjing3 DONG Ping3, 4.Experimental Study and Numerical Simulation of Crystallization-induced Blockage in Drainage Pipes in Karst Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 159-166
[8] FENG Huijun.Construction and Safety Control of New Metro Tunnels Passing under Existing Operational Metro Lines in Close Proximity[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 220-226
[9] ZHANG Kexue1,2,3,4,5,6 YANG Haijiang1,2,5 HE Manchao3 SUN Jiandong1,2,5 LI Dong1,2,5 CHENG Zhiheng1,2,5.Comprehensive Evaluation of the Intelligent Degree of the Mining Face Based on Grey Relational Analysis[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 69-79
[10] DING Xiaobin HAN Donglin.Analysis of Mechanical Performance of Operational Shield Tunnels under Different Ovality Deformations[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 141-148
[11] TANG Langzhou1,2 YU Li1,2 WANG Yusuo1,2 WANG Zhuhong1,2 WANG Mingnian1,2.Numerical Analysis on the Effect of Strike-slip Fault Dislocation on the Structural Safety of Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 214-224
[12] CHEN Shaohua.Study on New Structural Type of the Emergency Rescue Station of Mabaishan Tunnel in Qinling Mountains[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 35-41
[13] HE Leping1 XU Yingdong1 HU Qijun1 CAI Qijie2.Assessment of Large Deformation Risk in Soft Rock Tunnels Based on Game Theory - Cloud Model[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 85-94
[14] XU Gongyun1 XU Wanghao1,2 YAO Zhigang1 FANG Yong1 LIU Sijin3.Analysis on Influence of Penetration Angle on Disc Cutter Impact Based on Three-dimensional RBD-DEM Coupling Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 77-84
[15] WANG Yingxue1 LUO Yang1 ZHANG Ziwei1 WANG Guoyi2 SONG Xiangshuai1.Analysis of Influence of Arc Cutterhead on Ground Settlement during EPB Shield Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 155-162
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY