Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2024, Vol. 61 Issue (1) :272-282    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on Seepage Crystallization Pattern of Tunnel Shotcrete of Different Ages
(1. School of Highway, Chang′an University, Xi′an 710064; 2. YCIC Investment Co., Ltd., Kunming 650103)
Download: PDF (6370KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The crystallization induced blockage defect in tunnel drainage system is closely related to groundwater seepage in shotcrete. In order to ascertain the correlation between the curing age of shotcrete and crystallization induced defect, a home-built indoor simulation device is used to simulate the seepage-crystallization process of tunnel shotcrete. The mass of crystal and the pH value and calcium ion concentration of effluent solution from drainage pipe have been measured, and XRD, thermogravimetric analysis, electron microscope scanning and mercury injection test have been conducted, so as to reveal the deterioration process of the shotcrete of different ages and the crystallization pattern in drainage pipe under groundwater seepage conditions. As the results indicate: (1) The curing age of shotcrete is a key factor that affects the crystallization induced defect of tunnel, and the early age affects it particu? larly significantly. Under seepage conditions, the crystal mass in drainage pipe in the concrete with 2 h age is essentially 30 times that in the concrete with 28 d age; (2) Longer concrete curing age means the pH value will decrease faster, pH value will stabilize sooner and calcium ion concentration will stabilize sooner; (3) After 60 d of internal seepage in the concrete of different ages, only very small amount of ettringite and C-S-H gel are observed inside the concrete, the structure is uneven, and the concrete has high total porosity; The interior of concrete contains calcium hydroxide crystal, and as the curing age increases, the crystal changes from small amount of flocculent crystal in unstable state to large amount of lumpy crystal in stable state; Longer curing age means less concrete hydration products are dissolved out. According to the thermogravimetric analysis, the calcium hydroxide content of the concrete with 28 d age is 5.9 times that of the concrete with 2 h age.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
TONG Yueping1 TIAN Chongming1 YE Fei1 JIANG Yin1 ZHANG Junyuan1 WU Bowen1WANG Han1 LI Wenhui2
KeywordsTunnel   Crystallization induced blockage in drainage pipe   Shotcrete   Curing age   Sseepage crystallization     
Abstract: The crystallization induced blockage defect in tunnel drainage system is closely related to groundwater seepage in shotcrete. In order to ascertain the correlation between the curing age of shotcrete and crystallization induced defect, a home-built indoor simulation device is used to simulate the seepage-crystallization process of tunnel shotcrete. The mass of crystal and the pH value and calcium ion concentration of effluent solution from drainage pipe have been measured, and XRD, thermogravimetric analysis, electron microscope scanning and mercury injection test have been conducted, so as to reveal the deterioration process of the shotcrete of different ages and the crystallization pattern in drainage pipe under groundwater seepage conditions. As the results indicate: (1) The curing age of shotcrete is a key factor that affects the crystallization induced defect of tunnel, and the early age affects it particu? larly significantly. Under seepage conditions, the crystal mass in drainage pipe in the concrete with 2 h age is essentially 30 times that in the concrete with 28 d age; (2) Longer concrete curing age means the pH value will decrease faster, pH value will stabilize sooner and calcium ion concentration will stabilize sooner; (3) After 60 d of internal seepage in the concrete of different ages, only very small amount of ettringite and C-S-H gel are observed inside the concrete, the structure is uneven, and the concrete has high total porosity; The interior of concrete contains calcium hydroxide crystal, and as the curing age increases, the crystal changes from small amount of flocculent crystal in unstable state to large amount of lumpy crystal in stable state; Longer curing age means less concrete hydration products are dissolved out. According to the thermogravimetric analysis, the calcium hydroxide content of the concrete with 28 d age is 5.9 times that of the concrete with 2 h age.
KeywordsTunnel,   Crystallization induced blockage in drainage pipe,   Shotcrete,   Curing age,   Sseepage crystallization     
Cite this article:   
TONG Yueping1 TIAN Chongming1 YE Fei1 JIANG Yin1 ZHANG Junyuan1 WU Bowen1WANG Han1 LI Wenhui2 .Study on Seepage Crystallization Pattern of Tunnel Shotcrete of Different Ages[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(1): 272-282
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2024/V61/I1/272
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] WANG Sheng1,2,3,4 WEI Qin1,2 LI Liping3.Catastrophic Mechanisms and Research Development Trends of Water and Mud Inrushes in Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 15-25
[4] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[5] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[6] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[7] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[8] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[9] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[10] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
[11] ZHONG Wulin1 HAN Xingbo1 YE Fei1 WANG Han1 CAO Xiaoyong2 XI Weizheng2.Research on Wind Resistance and Optimization Design of Steel Corrugated Plate Support for Tunnel Shafts[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 197-207
[12] JIA Yonggang1 HAO Zihan1 LU Weidong1 WU Fan1 YANG Weiwei2.Mechanical Behavior of Steel Fiber Reinforced Concrete Segments with Different Joint Configurations[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 182-196
[13] TAN Xinyu1 WEI Meng1,2 LAN Lingshen1 SHANG Qiang1 ZHANG Haitao1.Experimental Test and Mechanism Study on Soil Adhesion Reduction Techniques for Mud Cake Formation on Shield Cutterheads[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 219-229
[14] LIU Liying1 WEI Lixin1 YU Zhiyuan2 YANG Xudong3 YE Tingting1.Key Construction Technologies for the Ruyifang Immersed Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 259-272
[15] LIU Pengfei1,2 ZENG Dexing2 WANG Xiao3 YANG Zhao2 LI Yu2.Experimental Evaluation and Application Study on the Shield Muck Cake Decomposition Agents[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 230-237
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY