Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2025, Vol. 62 Issue (1) :28-37    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on Steel Plate Cutting Deformation and Support Force for Excavation with Large Pipe Spacing in Pipe Curtain-Structure Method
(1. School of Traffic and Transportation Engineering, Dalian Maritime University, Dalian 116026; 2. JSTI Group, Nanjing 210017;3. School of Civil Engineering, Beijing Jiaotong University, Beijing 100044)
Download: PDF (4885KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In case of using the pipe curtain-structure method to cross existing underground structures, it may be re? quired to excavate soils between pipes with large spacing. During excavation soils between the pipes with large spacing,the deformation pattern of the steel plate cutting process and the prediction of support force are crucial. Based on the proposed steel plate cutting scheme for pipes with large spacing in a practical engineering project, a numerical model is established. A wedge instability model for the square steel plate cutting surface between large spacing pipes is then introduced, and the analytical solution for the ultimate support force of the cutting surface is derived.Further, the influences of various factors on surface settlement and support force are analyzed. The results indicate that: (1) The theoretical calculation method has good applicability to steel plate cutting between large spacing pipes;(2) The cutting size of the steel plate has the greatest impact on surface settlement, while the pipe burial depth has the least impact; (3) As the burial depth increases, the required support pressure for the cutting surface increases,but the rate of increase decreases. Based on these findings, a construction plan of "small cutting, minimal disturbance, and frequent support" is proposed to ensure safe construction.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LIU Xiang1 LI Kuichen1 ZHANG Rui1 HUANG Jun2 ZHAO Guang2 FANG Qian3 JIANG Annan1
KeywordsPipe curtain-structure method   Large spacing pipe excavation   Steel plate cutting   Deformation mode   Support force     
Abstract: In case of using the pipe curtain-structure method to cross existing underground structures, it may be re? quired to excavate soils between pipes with large spacing. During excavation soils between the pipes with large spacing,the deformation pattern of the steel plate cutting process and the prediction of support force are crucial. Based on the proposed steel plate cutting scheme for pipes with large spacing in a practical engineering project, a numerical model is established. A wedge instability model for the square steel plate cutting surface between large spacing pipes is then introduced, and the analytical solution for the ultimate support force of the cutting surface is derived.Further, the influences of various factors on surface settlement and support force are analyzed. The results indicate that: (1) The theoretical calculation method has good applicability to steel plate cutting between large spacing pipes;(2) The cutting size of the steel plate has the greatest impact on surface settlement, while the pipe burial depth has the least impact; (3) As the burial depth increases, the required support pressure for the cutting surface increases,but the rate of increase decreases. Based on these findings, a construction plan of "small cutting, minimal disturbance, and frequent support" is proposed to ensure safe construction.
KeywordsPipe curtain-structure method,   Large spacing pipe excavation,   Steel plate cutting,   Deformation mode,   Support force     
Cite this article:   
LIU Xiang1 LI Kuichen1 ZHANG Rui1 HUANG Jun2 ZHAO Guang2 FANG Qian3 JIANG Annan1 .Study on Steel Plate Cutting Deformation and Support Force for Excavation with Large Pipe Spacing in Pipe Curtain-Structure Method[J]  MODERN TUNNELLING TECHNOLOGY, 2025,V62(1): 28-37
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2025/V62/I1/28
 
No references of article
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY