Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2025, Vol. 62 Issue (2) :283-290    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on the Control Law of Surface Deformation in Shield Tunnels in Mudstone Strata with the Clay Shock Construction Method
(1. Key Laboratory of Transportation Tunnel Engineering of the Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 2. Nation Engineering Research Center of Geological Disaster Prevention Technology in Land Transportation, Southwest Jiaotong University, Chengdu 610031; 3. China Railway No.4 Engineering Group Co., Ltd., Hefei 230022; 4. The Second Engineering Co., Ltd. of CTCE Group, Suzhou 215131)
Download: PDF (4998KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Ground settlement and deformation caused by shield tunnelling is a critical issue that needs to be ad? dressed during construction. The clay shock construction method is an important measure to control surface settlement and deformation during shield tunnelling. To explore the effect law of the clay shock method on surface settlement and deformation in mudstone strata during shield tunnel construction and its control effect, this study uses Sichuan Normal University station to Jiaozili Flyover station running tunnel section of the Chengdu Metro Line 13 as a case study. The research investigates the impact of the clay shock method on surface deformation when tunnelling through mudstone strata, and indoor tests are conducted to reveal the viscosity variation of clay shock samples with different material ratios. Finally, the clay shock method is applied in the field construction, verifying and analyzing its effectiveness. The results indicate: (1) Filling the shield excavation gap with clay shock slurry has a significant impact on surface settlement, reducing the maximum surface settlement by approximately 23.48%; (2) The soil-towater ratio significantly affects the viscosity of the clay shock slurry. The smaller the soil-to-water ratio, the higher the slurry viscosity, and the additives can regulate the slurry viscosity within a certain range; (3) The field measurement data and research results are consistent (with an error of approximately 10%), and the surface settlement value is within the engineering requirement of -20 mm.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHANG Xinyang1
2 SHEN Yusheng1
2 CHANG Mingyu1
2 LIU Tong1
2 SUN Tianshe3
4 HU Shuai3
4
KeywordsShield tunnel   Surface settlement   Clay shock construction method   Indoor experiment   Field monitoring     
Abstract: Ground settlement and deformation caused by shield tunnelling is a critical issue that needs to be ad? dressed during construction. The clay shock construction method is an important measure to control surface settlement and deformation during shield tunnelling. To explore the effect law of the clay shock method on surface settlement and deformation in mudstone strata during shield tunnel construction and its control effect, this study uses Sichuan Normal University station to Jiaozili Flyover station running tunnel section of the Chengdu Metro Line 13 as a case study. The research investigates the impact of the clay shock method on surface deformation when tunnelling through mudstone strata, and indoor tests are conducted to reveal the viscosity variation of clay shock samples with different material ratios. Finally, the clay shock method is applied in the field construction, verifying and analyzing its effectiveness. The results indicate: (1) Filling the shield excavation gap with clay shock slurry has a significant impact on surface settlement, reducing the maximum surface settlement by approximately 23.48%; (2) The soil-towater ratio significantly affects the viscosity of the clay shock slurry. The smaller the soil-to-water ratio, the higher the slurry viscosity, and the additives can regulate the slurry viscosity within a certain range; (3) The field measurement data and research results are consistent (with an error of approximately 10%), and the surface settlement value is within the engineering requirement of -20 mm.
KeywordsShield tunnel,   Surface settlement,   Clay shock construction method,   Indoor experiment,   Field monitoring     
Cite this article:   
ZHANG Xinyang1, 2 SHEN Yusheng1, 2 CHANG Mingyu1 etc .Study on the Control Law of Surface Deformation in Shield Tunnels in Mudstone Strata with the Clay Shock Construction Method[J]  MODERN TUNNELLING TECHNOLOGY, 2025,V62(2): 283-290
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2025/V62/I2/283
 
No references of article
[1] SONG Zhanping1,2,3 LI Xueli1 ZHANG Yuwei1,2,3 ZHONG Shiming1 SHI Wei4.Review and Prospect of the Mining Construction Methods for Subway Stations in China[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 1-15
[2] YU Tongsheng1,2 GUAN Linxing3 YAN Zhiguo1,2.A Review of Researches on the Multi-disaster Scenarios and Structural Responses in Metro Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 16-26
[3] ZHU Yeting1,2 ZHU Yanfei1 WANG Zhihua1,3 WANG Shuaifeng4 WANG Hao1 MA Zhigang1.Theoretical Innovation, Method Implementation, and Engineering Verification of Shield Machine with Thrust Vector Intelligent Control[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 71-78
[4] XIAO Mingqing1 FENG Kun2 XUE Guangqiao1 WANG Yunchao2 LU Zhipeng1 CHEN Long2.Study on the Influence Factors of Additional Earth Pressure Caused by Shield Attitude Deviation in Soft Soil Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 141-150
[5] YAO Zhanhu1 YANG Qin2 LI Hui2 WEI Daiwei2 MENG Jia2.Study and Application of Dual-component Synchronous Grouting Technology in Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 265-273
[6] CAI Haoming.Effects of Bedrock Blasting Pretreatment on Shield Tunnelling and Rock Fragmentation Mechanism[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 192-200
[7] ZHOU Bin1,2,3,4 FENG Jianjun1,2,3,4 WEN Xiaokai3,4 RAN Mi5.Research on Automatic Detection Technology for Shield Tunnel Segment Misalignment Based on Point Cloud Data[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 83-91
[8] MU Haixing1 FENG Kun1 GUO Wenqi1 YANG Shaoyi1 ZHANG Liangliang2.Study on the Mechanical Behavior and Failure Characteristics of Ultra-large Diameter Shield Tunnel Segment Structures[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 125-134
[9] WAN Dongxing1 ZHANG Di2 SUN Feng2 PAN Chenxin3 ZHU Zhenwei1 XU Xiaofeng1 HE Chao1 SHEN Tuqi1.Study on the Mechanical Response of Tunnel Segment Structures in Ultra-large Diameter Shallow-buried Shield Tunnels during Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 135-146
[10] WU Zihan1 LU Qingrui1 XIE Binbin1,2 CHEN Shijun1 DAI Tao1 CHEN Liming1.Influence of Shield Tunnel Backfill Grouting with Red Mud-fly Ash Geopolymer on Surface Settlement[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 285-
[11] CHEN Wang1 PENG Yanfeng1 LIU Weizheng2 ZHANG Siyu2 CHEN Changhui1.Analysis of the Impact of the Three Pipe Jacking Over-crossing Construction on Existing Tunnel and Surface Deformation[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 170-182
[12] WU Beiyu1 XIE Weiping2 LIN Xingtao1,3,4 GAO Chen2 SU Dong1,3,4 CHEN Xiangsheng1,3,4.Study on Settlement Patterns of the CFG Pile-reinforced High-speed Railway Subgrade Caused by Parallel Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 139-147
[13] QIU Wei1 ZENG Qingcheng1 OUYANG Jian1 MU Haixing2 GUO Wenqi2 FENG Kun2 HU Dawei3.Study on Shear Mechanical Performances of Circumferential Mortise and Tenon Joints with Oblique Bolts in Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 129-138
[14] XUE Qingsong.Deformation Distribution Characteristics and Control Measures of Large-section Rectangular Pipe Jacking Over-crossing Metro Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 148-161
[15] CHEN Xiangsheng1,2,3 CHEN Weijie2 LI Rongkang2 GU Wentian1 LU Yuan1 LI Qiang2,3 SU Dong2,3.Design and Application of a Prefabricated Loading Platform for Full-scale Shield Tunnel Test[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 1-9
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY