Risk Mitigation Measures and Excavation Analysis of Shield Launching beneath an Existing Metro Station on the First Terrace of the Yangtze River
(China Railway Construction Investment Group Co., Ltd., Zhuhai 519000)
Download: PDF (8145KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract This study addresses the construction challenges and safety risks associated with the shield launching beneath an existing metro station in the water-rich silty fine sand strata of the Yangtze River′s first terrace. The key risks include water and sand inrush at the tunnel portal, deformation of the existing metro track bed, difficulty in establishing earth pressure balance in the excavation chamber, and continuous grinding of diaphragm walls. This paper systematically presents the adopted engineering countermeasures. Statistical analysis of six key excavation parameters lincluding earth chamber pressure, cutterhead torque, cutterhead rotation speed, penetration rate, advance speed, and total thrust reveals the characteristic variations during shield launching beneath the existing station. In addition, abnormal excavation conditions, glass fiber rebar cutting, and track bed deformation are thoroughly analyzed. The findings provide valuable technical guidance for similar underground crossing projects under complex geological conditions.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
CHEN Yunyao
KeywordsYangtze River first terrace   Shield launching   Under-crossing existing metro station   Risk control   Coun? termeasures   Excavation parameter optimization     
Abstract: This study addresses the construction challenges and safety risks associated with the shield launching beneath an existing metro station in the water-rich silty fine sand strata of the Yangtze River′s first terrace. The key risks include water and sand inrush at the tunnel portal, deformation of the existing metro track bed, difficulty in establishing earth pressure balance in the excavation chamber, and continuous grinding of diaphragm walls. This paper systematically presents the adopted engineering countermeasures. Statistical analysis of six key excavation parameters lincluding earth chamber pressure, cutterhead torque, cutterhead rotation speed, penetration rate, advance speed, and total thrust reveals the characteristic variations during shield launching beneath the existing station. In addition, abnormal excavation conditions, glass fiber rebar cutting, and track bed deformation are thoroughly analyzed. The findings provide valuable technical guidance for similar underground crossing projects under complex geological conditions.
KeywordsYangtze River first terrace,   Shield launching,   Under-crossing existing metro station,   Risk control,   Coun? termeasures,   Excavation parameter optimization     
Cite this article:   
CHEN Yunyao .Risk Mitigation Measures and Excavation Analysis of Shield Launching beneath an Existing Metro Station on the First Terrace of the Yangtze River[J]  MODERN TUNNELLING TECHNOLOGY, 2025,V62(3): 249-258
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2025/V62/I3/249
 
No references of article
[1] HAO Junsuo.Study on Key Intelligent Construction Technologies of Super-long and Deepburied Hydraulic Tunnels under Complex Geological Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 188-196
[2] YANG Jihua1 GUO Weixin1 YAN Changbin2 MIAO Dong1.Study on Optimization of TBM Driving Parameters Based on the Energy Consumption[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 54-60
[3] XU Futian.Application of Jacking Technology with Adjustable Counter Weights in Box Culvert Construction above Existing Metro Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 182-187
[4] LUO Chi1 LEI Junfeng2 SHI Jixun1.Study on Safety Risks Management of the Road Tunnel underneath High-pressure Oil Pipelines[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 200-204
[5] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 133-139
[6] HONG Kairong1,2 FENG Huanhuan1,2.Construction Difficulties and Key Techniques for the Gaoligong Mountain TBM Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 1-8
[7] WANG Gang- 1 Wang-Li-Chuan- 2, 3 Chou-Wen-Ge- 1 Gong- Lun- 1 Wu- Jian- 4.Analysis and Considerations of an Express Railway Tunnel Lining Failure by Seasonal Karst Conduct Flow[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(6): 210-218
[8] Yao Zhanhu.Construction Risk Assessment for the Shield-Driven Section of the Nanjing Weisan Road River-Crossing Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 49-54
[9] GAO Bing-Li, REN Jian-Xi.Influence of Launching Shaft Construction on Surrounding Pipeline Deformation and a Control Technique[J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(3): 193-199
[10] LIAN Chang-Jiang, Li-Jian-Ping.Discussion and Analysis of the Rock Breaking Techniques for the Tunnel Shield-Launching End [J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(2): 140-146
[11] Hu Yongli.Mechanism of Collapse and Countermeasures Used During Construction of a Shallow-Buried Tunnel of the Beijing Metro[J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(1): 8-15
[12] LI Hua-Yun-1, Zhang-Zhi-Qiang-1, Zhang, YANG 1, Chen-Li-Ming-1, Yang, XIANG 2, Zhang-Xiao-Wei-2.A Study of the Basic Issues Regarding the Swelling Pressure Analytical Solution for Mountain Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(1): 54-61
[13] FENG Huan-Huan, Chen, KUI , Wang-Zhu-Feng, Zhang-He-Pei.Discussion of Key Construction Techniques for a Shield-Driven Tunnel in a Water-Rich Mixed Ground [J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(1): 186-191
[14] .Shield Launching within a Short Distance of an Operating Metro[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(1): 161-165
[15] TANG Xie, LIN Guo-Jin, DENG Cheng-Bo.Safety Risk Assessment of the Gaoersi Extra-Long Highway Tunnel in the Design Stage[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(5): 91-98
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY