Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2019, Vol. 56 Issue (4) :49-55    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils
(1 Foshan Railway Investment Construction Group Co., Ltd, Foshan 528000; 2 Shanghai Key Laboratory of Rail Infrastructure Durability and System Safety, Key Laboratory of Road and Traffic Engineering of Ministry of Education, Shanghai 201804)
Download: PDF (2728KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Large settlement or differential settlement of shield tunnels built in soft soils occurs in long-term service,affecting performance of segment structure and operating safety. On the background of Foshan metro line 3, this article studied the development law of medium and long-term settlement of shield tunnels in soft soils with different thicknesses and the influence of subsoil reinforcement on long-term settlement by centrifugal model test. The results indicate that the worse and thicker the underlying stratum of tunnel is, the larger the long-term settlement is,and the longer the long-term settlement development is. At the same time, long-term settlement increases under large buried depth; long-term tunnel settlement and ground surface deformation decrease with an increase of foundation soil reinforcement depth, but the decrease extent reduces gradually, and the long-term settlement decreases by 16.7%, 30.2% and 41.3% respectively when the reinforcement depths of foundation soil are 3 m, 6 m and beyond the soft soil, and the ground surface deformation right above the tunnel decreases by 25.4%, 44.9% and 66.3% respectively
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHU Jianfeng1 GONG Quanmei2
KeywordsShield tunnel   Soft soil   Centrifugal model test   Foundation reinforcement   Long-term settlement     
Abstract: Large settlement or differential settlement of shield tunnels built in soft soils occurs in long-term service,affecting performance of segment structure and operating safety. On the background of Foshan metro line 3, this article studied the development law of medium and long-term settlement of shield tunnels in soft soils with different thicknesses and the influence of subsoil reinforcement on long-term settlement by centrifugal model test. The results indicate that the worse and thicker the underlying stratum of tunnel is, the larger the long-term settlement is,and the longer the long-term settlement development is. At the same time, long-term settlement increases under large buried depth; long-term tunnel settlement and ground surface deformation decrease with an increase of foundation soil reinforcement depth, but the decrease extent reduces gradually, and the long-term settlement decreases by 16.7%, 30.2% and 41.3% respectively when the reinforcement depths of foundation soil are 3 m, 6 m and beyond the soft soil, and the ground surface deformation right above the tunnel decreases by 25.4%, 44.9% and 66.3% respectively
KeywordsShield tunnel,   Soft soil,   Centrifugal model test,   Foundation reinforcement,   Long-term settlement     
Cite this article:   
ZHU Jianfeng1 GONG Quanmei2 .Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(4): 49-55
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2019/V56/I4/49
 
No references of article
[1] DENG Mingjiang1 TAN Zhongsheng2.Some Issues during TBM Trial Advance of Super-long Tunnel Group and Development Direction of Construction Technology[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 1-12
[2] SONG Yongjun CHE Yongxin REN Jianxi ZHANG Kun.Experimental Study on Creep Characteristics of Anchored Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 13-18
[3] YAN Gengsheng1,2 HE Xiaoliang1,2 HAN Jinming3 ZHAO Shuang3 ZHAO Cheng1,2.Analysis on the Survey Techniques of Shield Tunnels in Sandy Pebble Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 19-25
[4] ZHANG Heng ZHANG Gang SUN Jianchun ZHUYimo CHEN Shougen.Correlation Analysis of Q Value and Mechanical Parameters of Surrounding Rocks and Its Engineering Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 26-34
[5] LI Junda1,2 LI Yuanfu1,2 LI Shiqi1,3 LIU Kai1,3 WANG Guangkai1,2.A CBR-based Aided Decision Model for the Mountain Railway Tunnel Excavation Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 35-41
[6] WANG Qiuyi1 YANG Kui2 MAO Jinlong2 YANG Qingyuan3 ZHAO Boming3.Study on the Comprehensive Aseismic Measures for the Secondary Lining Structure of Highway Tunnels in Nine-degree Seismic Region[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 42-49
[7] ZHAO Licai1,2 YU Jianxing1.Design Optimization for the Rapid Excavation of Inclined Shaft of the Long Tunnel and Construction Period Estimation[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 50-57
[8] WANG Xu1 MENG Lu1 YANG Gang2 LU Song1.On Influencing Factors of the Tunnel Geological Prediction Results Obtained by Multi-source Seismic Interferometry[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 58-66
[9] TANG Bin XU Wenping.Discussion and Suggestions for Explosion-proof Based Modification of Construction Machinery and Vehicles in the Gas Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 67-71
[10] CAI Yaning ZHANG Jinxun WU Fumei.Brief Introduction to Revision of the Segment Section of“Code for Construction and Acceptance of Shield Tunnelling Method”[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 72-76
[11] CHEN Xi1 ZHAO Yong2 YANG Yushun3.Effect of Rock Mechanical Parameters on Stability of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 77-84
[12] LIU Siwei1 YANG Hongyun1,2 PAN Ruikai1.Research on Stratified Thickness Inversion of Roadway Composite Roof[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 85-91
[13] LI Fengyun.The Influential Factors on Instability of Slope during Excavation of a Metro Station Based on Upper Limit Analysis Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 92-97
[14] CUI Guangyao1 WANG Xuelai1 ZUO Kuixian1 WANG Mingnian2,3 JING Hongfei4.Study on Rigid and Flexible Compound Disaster Reduction Technology for the Tunnel with High Rock Temperature in Meizoseismal Area[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 98-103
[15] WANG Xing1 QIN Wei2 MA Jia3 WANG Lei1.Study on Local Structural Resistance of Ventilation System in Highway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 104-113
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY