Research and Development of the Embedded Rubber Waterstops Reinforced with Horizontally Built-in Steel Plates
(Engineering Management Center of China State Railway Group Co., Ltd., Beijing 100844)
Download: PDF (2589KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The prominent quality problems of construction joints of railway tunnel linings are mainly represented by displacement, twisting, cockling of the embedded rubber waterstops during concrete pouring and this results in the risks of lamelliform concrete at construction joints and chip off-falling, endangering railway traffic safety. However the visual effect of tunnel linings is affected if the lamellated concrete is removed. In view of this, the embedded rubber waterstop reinforced with horizontally built-in steel plate is developed, and the problems concerning complex site installation and management are radically solved by the industrialized steel plate embedded in the rubber waterstop, without changing the material performances of rubber. The field test shows this new waterstop is worth being promoted and applied attributed to the characteristics of easy use, good installation quality, high efficiency and low cost.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHANG Minqing LI Shu LIU Juncheng
KeywordsRailway tunnel   Lining   Construction joint   Embedded rubber waterstop reinforced with horizontally built-in steel plate   Research and development     
Abstract: The prominent quality problems of construction joints of railway tunnel linings are mainly represented by displacement, twisting, cockling of the embedded rubber waterstops during concrete pouring and this results in the risks of lamelliform concrete at construction joints and chip off-falling, endangering railway traffic safety. However the visual effect of tunnel linings is affected if the lamellated concrete is removed. In view of this, the embedded rubber waterstop reinforced with horizontally built-in steel plate is developed, and the problems concerning complex site installation and management are radically solved by the industrialized steel plate embedded in the rubber waterstop, without changing the material performances of rubber. The field test shows this new waterstop is worth being promoted and applied attributed to the characteristics of easy use, good installation quality, high efficiency and low cost.
KeywordsRailway tunnel,   Lining,   Construction joint,   Embedded rubber waterstop reinforced with horizontally built-in steel plate,   Research and development     
Cite this article:   
ZHANG Minqing LI Shu LIU Juncheng .Research and Development of the Embedded Rubber Waterstops Reinforced with Horizontally Built-in Steel Plates[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(6): 52-56
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2019/V56/I6/52
 
No references of article
[1] WANG Mingnian1,2 GUO Xiaohan1,2 CUI Peng1,2 YU Li1,2.Discussion on the Key Techniques for Disaster Prevention, Evacuation and Rescue of Large-scale Railway Tunnel Group in High Altitude Area[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 1-7
[2] ZHU Yongsheng1 LI Pengfei2.Research Progress of Hoek-Brown Strength Criterion and Determination of Mechanical Parameters of Rock Mass[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 8-17
[3] ZHENG Yuchao1 ZHANG Wensheng1 SUN Keguo1 CAI Jialiang1 LI Jie2 LENG Biao1 ZHAO Ruiwen2.Study on the Stability of Large-Span Tunnel by Distinct Element Based Strength Reduction Method[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 18-25
[4] LIU Xuezeng1,2 CAI Xin3 DING Maorui3 CHEN Fubin3 DENG Feng3.Study on Health Evaluation Method of Large-Span Highway Tunnel with Fractured Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 26-35
[5] TAO Weiming1 LI Huayun2 ZHANG Zhiqiang2 GUO Yongfa3.Study on the Shear Strength of Surrounding Rocks and Mechanical Behaviors of Supporting Structure of the Shallow-buried Tunnel in Swelling Soil[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 36-43
[6] MA Shiqiang1,2.On Relationship between Surrounding Rock Deformation and Surrounding Rock Pressure under Large Deformation of Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 44-50
[7] DU Jun1,2 MEI Zhirong2 FU Lilei3 CHEN Yongzhao3.Study on Working Face Stability of the Shallow-buried Tunnel in Soft Surrounding Rocks Based on Strength Reduction Theory[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 51-57
[8] GUO Chenggang1 GUO Yongfa2 ZHU Menglong3 ZHANG Qingwen3.Hydrogeological Investigation of the Underground River of Karst Tunnel in Carbonate Rock of Red Bed[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 58-64
[9] ZHAN Xianjun PEI Taotao ZHOU Jibing.Visualization Analysis of Metro Station Deformation Based on Thermodynamic Diagram[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 65-69
[10] CAI Yaning1 HUANG Qingjie2.Relevant Standards and Quality Management of the Mould for Reinforced Concrete Segments of Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 70-75
[11] YAN Tao1 LI Kunjie1 QIN Pengcheng1 CHEN Jingyu1,2 LIN Rui3 ZUO Qiang3.Calculation Method for the Surrounding Rock Pressure of Mined Lower Tunnel Structure of a Metro Station Built by Combination of Open Cut and Mined Method[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 76-82
[12] WANG Jun LIN Guojin.Study on the Characteristics of Secondary Lining Cracking under the Effect of Rheological Load[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 83-90
[13] LIN Zhibin ZHANG Boyang YANG Dafang.Simulation Study on Foundation Pit Excavation in Soft Soil Considering Effect of Creep and Seepage[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 91-98
[14] PENG Qi.Influence of Foundation Construction and Additional Load of Transfer Structure on Underneath Metro Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 99-104
[15] PENG Yan1,2 FANG Hui1,2 LV Qinyin1,2.Forward and Inversion Simulation of Tunnel Reflection Wave Tomography and a Contrastive Analysis of TRT Inversion[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 105-114
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY