Analysis of Deformation Stability Reliability of Tunnel Surrounding Rocks Based on Vector Projection Response Surface Method
(1 Key Laboratory of Road & Bridge and Underground Engineering of Gansu Province,Lanzhou 730070;2 School of Civil Engineering, Lanzhou Jiaotong University,Lanzhou 730070; 3 China Railway 21st Bureau Group Co., Ltd. , Lanzhou 730070)
Download: PDF (1712KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Stability of rock mass deformation is an important factor to ensure the safety of tunnel construction, the deformation stability function of surrounding rock is of implicit or highly nonlinear due to many factors affecting the stability of surrounding rock deformation, while the calculation can be simplified and the accuracy can be guaranteed by using vector projection response method. In order to judge the stability of surrounding rock by reliability theory, the performance function of rock mass deformation stability of the circular tunnel is established by taking the analytical solution of rock mass displacement of the circular tunnel as the rock mass displacement function which is obtained by taking the Mohr-Coulomb strength theory as the rock mass yield condition, and taking the crown settlement as the ultimate displacement of rock mass deformation when the rock mass surface of unsupported circular tunnel reaches shear plastic limit. Using the vector projection sampling method, the response surface function is solved by determining the sampling points based on gradient projection of response surface function, the reliability indexes of rock mass deformation stability are calculated by first-order second-moment method, a comparison with the results calculated with Monte Carlo method is conducted, and the reliability of tunnel rock mass deformation stability is evaluated.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
GUO Jian1
2 YANG Zhiguo1
2 KANG Fengxue3
KeywordsTunnel;Surrounding rock deformation;Rock mass stability   Vector projection response surface method   Reliability index     
Abstract: Stability of rock mass deformation is an important factor to ensure the safety of tunnel construction, the deformation stability function of surrounding rock is of implicit or highly nonlinear due to many factors affecting the stability of surrounding rock deformation, while the calculation can be simplified and the accuracy can be guaranteed by using vector projection response method. In order to judge the stability of surrounding rock by reliability theory, the performance function of rock mass deformation stability of the circular tunnel is established by taking the analytical solution of rock mass displacement of the circular tunnel as the rock mass displacement function which is obtained by taking the Mohr-Coulomb strength theory as the rock mass yield condition, and taking the crown settlement as the ultimate displacement of rock mass deformation when the rock mass surface of unsupported circular tunnel reaches shear plastic limit. Using the vector projection sampling method, the response surface function is solved by determining the sampling points based on gradient projection of response surface function, the reliability indexes of rock mass deformation stability are calculated by first-order second-moment method, a comparison with the results calculated with Monte Carlo method is conducted, and the reliability of tunnel rock mass deformation stability is evaluated.
KeywordsTunnel;Surrounding rock deformation;Rock mass stability,   Vector projection response surface method,   Reliability index     
Cite this article:   
GUO Jian1, 2 YANG Zhiguo1, 2 KANG Fengxue3 .Analysis of Deformation Stability Reliability of Tunnel Surrounding Rocks Based on Vector Projection Response Surface Method[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(6): 70-77
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2019/V56/I6/70
 
No references of article
[1] WANG Mingnian1,2 GUO Xiaohan1,2 CUI Peng1,2 YU Li1,2.Discussion on the Key Techniques for Disaster Prevention, Evacuation and Rescue of Large-scale Railway Tunnel Group in High Altitude Area[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 1-7
[2] ZHU Yongsheng1 LI Pengfei2.Research Progress of Hoek-Brown Strength Criterion and Determination of Mechanical Parameters of Rock Mass[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 8-17
[3] ZHENG Yuchao1 ZHANG Wensheng1 SUN Keguo1 CAI Jialiang1 LI Jie2 LENG Biao1 ZHAO Ruiwen2.Study on the Stability of Large-Span Tunnel by Distinct Element Based Strength Reduction Method[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 18-25
[4] LIU Xuezeng1,2 CAI Xin3 DING Maorui3 CHEN Fubin3 DENG Feng3.Study on Health Evaluation Method of Large-Span Highway Tunnel with Fractured Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 26-35
[5] TAO Weiming1 LI Huayun2 ZHANG Zhiqiang2 GUO Yongfa3.Study on the Shear Strength of Surrounding Rocks and Mechanical Behaviors of Supporting Structure of the Shallow-buried Tunnel in Swelling Soil[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 36-43
[6] MA Shiqiang1,2.On Relationship between Surrounding Rock Deformation and Surrounding Rock Pressure under Large Deformation of Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 44-50
[7] DU Jun1,2 MEI Zhirong2 FU Lilei3 CHEN Yongzhao3.Study on Working Face Stability of the Shallow-buried Tunnel in Soft Surrounding Rocks Based on Strength Reduction Theory[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 51-57
[8] GUO Chenggang1 GUO Yongfa2 ZHU Menglong3 ZHANG Qingwen3.Hydrogeological Investigation of the Underground River of Karst Tunnel in Carbonate Rock of Red Bed[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 58-64
[9] ZHAN Xianjun PEI Taotao ZHOU Jibing.Visualization Analysis of Metro Station Deformation Based on Thermodynamic Diagram[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 65-69
[10] CAI Yaning1 HUANG Qingjie2.Relevant Standards and Quality Management of the Mould for Reinforced Concrete Segments of Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 70-75
[11] YAN Tao1 LI Kunjie1 QIN Pengcheng1 CHEN Jingyu1,2 LIN Rui3 ZUO Qiang3.Calculation Method for the Surrounding Rock Pressure of Mined Lower Tunnel Structure of a Metro Station Built by Combination of Open Cut and Mined Method[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 76-82
[12] WANG Jun LIN Guojin.Study on the Characteristics of Secondary Lining Cracking under the Effect of Rheological Load[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 83-90
[13] LIN Zhibin ZHANG Boyang YANG Dafang.Simulation Study on Foundation Pit Excavation in Soft Soil Considering Effect of Creep and Seepage[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 91-98
[14] PENG Qi.Influence of Foundation Construction and Additional Load of Transfer Structure on Underneath Metro Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 99-104
[15] PENG Yan1,2 FANG Hui1,2 LV Qinyin1,2.Forward and Inversion Simulation of Tunnel Reflection Wave Tomography and a Contrastive Analysis of TRT Inversion[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 105-114